CAUTION!

”MOTIONS CAN AUTOMATICALLY RE-START WHEN THE

EMERGENCY SPREADER STOP IS RE-SET!”

______________________________________________________________________________________________________

1 BROMMA CONQUIP AB 06 02 ENG

rev.

6 • Start - Up procedure

ASSEMBLY OF TOWER (drg no 34476) 1 Check spreader and tower for damage.

2 Suspend the tower from a suitable forklift or crane (tower weight 1,4 t) using

the main lifting pin (pos 1).

3 Remove the protective material from the robalon pads on tower (pos 2). Remove the drive sprocket cover (pos 6).

Remove the (2) lifting lugs from main frame of the spreader at the assembly end

(pos 3).

5 Lower the flipper arm, at assembly end of the spreader, by slackening hydraulic hoses on the motor.

NOTE: Take care that flipper does not fall down and cause injury! 6 Remove top fixings for rubber covers (pos 4).

7 Remove lamp assembly by taking out the quick release fastening from the four pins and lay the lamp assembly in the main frame.

8 Release the gravity point chain, by removing the two screws and the locking device from adjuster.

9 You are now able to slide the tower into the main frame close to the centre.

Note the direction of assembly. Arrows are painted on the tower and frame.

10 Now replace the lamp assembly, rubber covers and lifting lugs. If the flipper is rise at this time, care should be taken as it is liable to fall, now that the motor is empty.

______________________________________________________________________________________________________

2 BROMMA CONQUIP AB 06 02 ENG

rev. 11 Remove the drive sprocket cover (pos 6).

It is now possible to install the chain, complete with the anchor block fitted.

The chain goes, under the first sprocket, over the centre one and under the third.

To assist with the chain installation, pull the brake release lever, towards the back of the motor. It is then possible to turn the motor, using the handle supplied.

12 Replace the chain back into it's fixing point and tighten the adjusting screws, until the chain is tight (allow a sag of about 30 mm and place the tower in middle position) and replace the locking device. Grease the chain. 13 Replace sprocket cover.

14 Pass the main plug up through the tower and fix conduit pipes with screws supplied.

15 Place the cable into the top support clamp.

16 Connect the tower motor. The connections are marked u1 and w1 to give correct position.

NOTE: Take care, incorrect rotation may result in serious damage! 17 Secure the cable to bracket with suitable cable ties.

18 Fix limit switch detection bar into place (pos 7).

19 Check all bolts are tight and the spreader is clear of all discarded material and tools. Take care that nothing had fallen into the chain.

______________________________________________________________________________________________________

3 BROMMA CONQUIP AB 06 02 ENG

rev. TOWER FUNCTIONS AND TESTING

The tower function is to level/unlevel loaded containers. Any other use of the tower is an abuse of the equipment and could result in serious damage. When the spreader is locked onto a container, it is possible to move the tower in any direction. The tower will stay where it is placed. The return to the middle position is done by the crane driver. When he has driven the tower to yellow or blue, it goes always to the middle position.

To test the newly assembled unit, place the blockading pin clamps onto the spreader and lock the twistlocks. With the spreader on the ground, commence to travel the tower towards one end of the spreader. Now hold a piece of metal, i.e. spanner or screwdriver, in front of the stop switch, for the end that the tower is travelling. The tower should now stop.

Try the other direction. If both of the limits work, travel the tower to both ends of the spreader, to confirm the limits work on the detection bar. When at each end, unlock the twistlocks and release a clamp, to confirm the tower returns to it's centre position. If any of these functions fail, please seek advice.

WARNING!

Use the tower only to level loads, or serious damage may occur!

Never use the hand crank on the motor with power connected, or serious injury may occur!

______________________________________________________________________________________________________

4 BROMMA CONQUIP AB 06 02 ENG

rev.

Start - Up the spreader

1. Before any connection to container crane, place the main frame of the spreader on trestles or similar about 0,7 m height and in such a way that the flipper arms can be lowered.

2 Inspect the spreader for visible damage.

3. Connect the main current and control supply to the spreader. Connect the 24 pin plug to the service panel.

4. Start the electric motor of the hydraulic units by turning the ”pump on” switch on service panel.

5. For testing of the twistlocks all 4 blockading pins should be in ”up” position. This is achieved by using a blockading pin clamp. In the ”down” position the

blockading pins electrically and mechanically block all twistlock rotation.

6. Test all functions of the spreader using the push buttons and switches on the service panel.

a) When ”pump on” switch is on, both electric motors should be running in gable ends.

b) Operate the push buttons to put the spreader in the different length positions. As an additional length, check that the twistlock centre length is marked on the plate positioned on side of the main beam.

c) Check that the flippers works in pairs along the length of the spreader, individually at the gable ends, or all together by pressing the appropriate buttons.

d) Check that when clamps are fitted to the blockading pins and all pins are up, this will be indicated by the white lights on the spreader.

e) Check that the twistlocks lock/unlock and that the light indicators on the top of the spreader main frame indicate red when locked and green when

unlocked.

______________________________________________________________________________________________________

5 BROMMA CONQUIP AB 06 02 ENG

rev. 8. Check each end hydraulic assembly to ensure there are no oil leaks.

9. Note that the solenoid valves operating flippers and twistlocks can be manually operated if required.This is achieved by pushing the end of the solenoid with a small screwdriver. As power is generally always on the solenoid, the plug connection has to be disconnected first.

10. Service and lubrication should be carried out in accordance with the lubrication manual.