a) The prospective Consumer shall apply for temporary supply in the prescribed form to the Section / Sub-Division Office of the Licensee. No registration cum processing fee is payable. He shall pay service charges
of Rs.50/= per Installation and advance estimated power consumption charges as per Clause 12.01(c) at the prevailing Tariff rate.
b) The Licensee shall prepare the estimate for the service line required for arranging temporary power supply and communicate temporary power sanction indicating service charges, advance power consumption charges, etc.
c) Estimated Power consumption charges
Applicant / Consumer shall deposit advance estimated power consumption charges for the energy calculated at 12 units per KW per day for the duration of temporary power supply. This shall be adjusted towards periodical bills at the prevailing Tariff rates based on the actual consumption and any balance amount at the credit of the Consumer after the disconnection of temporary supply shall be refunded to him on application with in TWO months by a cheque or the same shall be adjusted to the existing permanent R.R No. in the name of the same Consumer as requested by him in his application. If the amount due to the Consumer is not refunded with in two months of receipt of valid refund bill, the Licensee shall pay interest at 1% per month on actual number of days of delay on the amount due for refund. If the amount deposited falls short of the power consumption charges, the Licensee shall take immediate action for recovery of the balance amount.
In addition to the above, if the load is 50 KW or more / 67 HP or more the Consumer has to pay fixed charges in addition to advance estimated power consumption charges at the prevailing Tariff rate. (d) On receipt of wiring diagram and completion-cum-test report of the
contractor and Agreement in the prescribed form and copies of permit / licence / NOC, etc., and payment of necessary advance consumption charges, work order for temporary supply shall be issued by the Licensee.
Note: (1) Permit / Licence / NOC is not required for floor polishing, Water pumping, marriages and domestic functions.
(2) Approval of the Electrical Inspectorate is required for temporary electrical installations where 100 or more people are likely to gather or assemble in a single place.
e) The Applicant shall arrange to execute the work of providing the service line including distribution Transformer if necessary for load of 50 KW and above and also service main work as per the Licensee‟s estimate and specifications on self-execution basis through a qualified licensed electrical Contractor. The Consumer shall pay to the Licensee supervision charges at 10% on the cost of estimate, subject to a minimum of Rs.100/-per work.
However, the service line work shall be commenced only after orders sanctioning the temporary supply is issued by the Licensee. The Consumer shall provide current limiter of appropriate capacity and earth leakage circuit breaker of adequate capacity and capacitors, if any, as required under Clause 23.00.
(f) The prevailing rate of temporary Tariff in force shall be applicable.
(g) The date of availment of the temporary supply may be got amended by the Consumer, by applying to the authority who has issued the power sanction before the commencement date indicated in the order. However, any alternate date proposed shall commence within 15 days of the date of the first order.
(h) If power is not availed as above, the advance estimated power consumption charges paid by the Applicant / Consumer shall be refunded with in two months after deducting Rs.100/- on receipt of the valid refund bill. If the amount due to the Consumer is not refunded with in two months of receipt of valid refund bill, the Licensee shall pay interest at 1% per month on actual number of days of delay on the amount due for refund.
(i) In case any permit / licence / NOC is withdrawn by the competent authority after the installation is serviced, the installation shall be disconnected forthwith and shall be reconnected only after the permit / licence / NOC is restored. Further, the Licensee shall not be liable for any damages. Reduction of any charges or refund shall not be permissible on this account.
(j) The installation shall be serviced by the Engineer of the Licensee by providing a suitable meter and assigning an R.R. No.
The Engineer of the Licensee servicing the installation shall give a service certificate to the Applicant / Consumer for having serviced the installation specifying the following: -
(1) R.R. No. (2) Date of service (3) Sanctioned load (4) Connected load (5) Meter details (6) Condition of seals (7) Details of amount of advance estimated power consumption charges collected (8)Name of L.E.C.& Licence No. (9) Period of sanction of temporary power supply, (10) Periodicity of reading of meter and issue of bill i.e., weekly/fortnightly etc.
Necessary acknowledgement for the same shall be obtained on the test report.
(k) For further extension of the period of temporary supply, the Consumer shall apply to the jurisdictional Engineer of the Licensee at least one week before the date of expiry of temporary supply, duly paying the up to date power supply charges and any other arrears.
(l) Temporary power supply to Touring Cinemas may be given on the production of a “Camp Allotment Letter” from the local District Magistrate permitting the Consumer for running of the Touring Cinemas and also certificate by the Electrical Inspector.
Note: However, power supply to touring cinemas may be continued for not more than one month after the expiry of the licence subject to the condition that the owner does not run shows until the licence is renewed.