PROJECT TITLE FY11/12 FY12/13 FY13/14 FY14/15 FY15/16 TOTAL

548 Emergency Projects 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 10,000,000

623 Collection System Active Flow Monitoring 300,000 300,000 300,000 300,000 300,000 1,500,000

643 Las Vegas Valley Manhole & Pipe Rehabilitation - Package 1 5,290,186 - - - - 5,290,186

644 Las Vegas Valley Manhole & Pipe Rehabilitation - Package 2 6,945,125 - - - - 6,945,125

657 Manhole Repair Emergency Projects 500,000 500,000 500,000 500,000 500,000 2,500,000

660 Collection System Services Construction Yard Improvements 86,587 1,181,634 - - - 1,268,221

661 Las Vegas Valley Manhole & Pipe Rehabilitation - Package 3 491,763 6,088,598 - - - 6,580,361

668 Paradise-Whitney Interceptor - Package 1 2,356,489 1,171,830 13,247,108 23,913,328 1,474,653 42,163,408

669 Paradise-Whitney Interceptor - Package 2 1,962,729 1,438,627 1,988,172 22,617,445 12,639,232 40,646,205

670 Paradise-Whitney Interceptor - Package 3 2,190,556 3,582,645 - 9,593,055 26,701,339 42,067,595

671 Paradise-Whitney Interceptor Easement Acquisition - 1,000,000 - - - 1,000,000

9860 Pipeline & Lift Station Oversizing / Interlocal Agreements 400,000 400,000 400,000 400,000 400,000 2,000,000

TBD037 Crosstown Interceptor Pipe Rehabilitation Project No. 3 - - - - 1,095,996 1,095,996

TBD063 Miscellaneous Collection System Rehabilitation Projects 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 10,000,000

TBD076 Las Vegas Valley Manhole & Pipe Rehabilitation - Package 4 193,915 2,123,371 - - - 2,317,286

TBD077 Las Vegas Valley Manhole & Pipe Rehabilitation - Package 5 67,631 356,680 4,646,202 - - 5,070,513

TBD078 Las Vegas Valley Manhole & Pipe Rehabilitation - Package 6 - 441,832 2,243,303 3,474,746 - 6,159,881

TBD079 Las Vegas Valley Manhole & Pipe Rehabilitation - Package 7 - - 310,153 2,576,186 819,992 3,706,331

TBD104 Las Vegas Valley Manhole & Pipe Rehabilitation - Package 8 - - - - 193,751 193,751

TBD144 Paradise-Whitney Interceptor Fiber Optic Conduit 310,000 930,000 930,000 930,000 - 3,100,000

TBD146 Sunset Interceptors 90 Degree Bend Realignments 82,257 40,843 462,180 834,315 51,449 1,471,044

TBD147 South Spencer Interceptor Relief Pre-Design 366,154 133,846 - - - 500,000

Project description

This project provides a five year budget allowance for collection system repair emergencies. Throughout the year, the District encounters situations where the traditional design, bid and build process does not meet the requirements of the problem at hand. Examples include: imminent sewer collapse due to pipe corrosion, a sewage lift station crisis, failure of critical plant equipment and flood damage. In order to protect public health and safety, immediate action must be taken to remedy the problems. Each emergency situation will be analyzed and a recommendation made to the General Manager. Only upon the review, approval, and declaration of an emergency by the General Manager will the project be initiated.

The District has a pre-approved contractor list developed through a competitive bid process to perform emergency work. Alternately, the District may select from a list of other eligible contractors to execute the project. Once the project is complete, a full report will be presented to the Board of Trustees.

Completed Work for FY10/11 and Planned Work for

FY11/12

Repairs will continue to be addressed as required in FY10/11 and FY11/12.

FY10/11 Completed Key Milestones

To date there have been 4 emergency repairs:

• Lamb Blvd. Manhole Replacement • 36" Pipe Puncture on West Meranto Ave. • Laughlin Manhole Replacement • Theme & Desert Inn 20" ERW

FY11/12 Planned Key Milestones

design Construction

FY11/12 FY12/13 FY13/14 FY14/15 FY15/16

budget Summary

* Includes Study & Planning, Pre-design, Design and Engineering Services during Construction ** Includes Construction and Construction Management

Schedule

Bar schedule and schedule milestones are as of March 4, 2011.

Oct 04

Jun 16

Budget Amount FY11/12 FY12/13 FY13/14 FY14/15 FY15/16 TOTAL

Design* - - - - Construction** 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 10,000,000 TOTAL 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 10,000,000

Cost Projection

Budget Cumulative Budget (Millions) Fiscal Year 12 9 6 3 0 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000

Project description

Install permanent flow monitoring instrumentation in 53 locations, primarily large-diameter interceptors. The equipment will be owned and operated by the vendor under a “Data Delivery Service" contract. Data will be routed to the District and be used by District Engineering as well as Operations and Maintenance staff. This project is required to determine real-time flow rates and available capacity in the collection system. It will model the effect of wastewater flows on the collection system from new residential, hotel/casino, high-rise condominiums, industrial, commercial and retail projects. The project will also allow the evaluation of diverting flows instead of bypass pumping for construction and shutdown of sewer lines for maintenance and/or rehabilitation.

continuous use since June 2009.

Completed Work for FY10/11 and Planned Work for

FY11/12

49 flow meters are installed in manholes and are operational. Vendor hosted website is online and operational. Planned work for FY11/12 is vendor installation of the four remaining meters, and 24 additional months of vendor meter system operation, maintenance, and data hosting.

FY10/11 Completed Key Milestones

N/A

FY11/12 Planned Key Milestones

Extend funding for 24 additional months of metering services – July 2011

design Construction

FY11/12 FY12/13 FY13/14 FY14/15 FY15/16

budget Summary

* Includes Study & Planning, Pre-design, Design and Engineering Services during Construction ** Includes Construction and Construction Management

Schedule

Bar schedule and schedule milestones are as of March 4, 2011.

Budget Amount FY11/12 FY12/13 FY13/14 FY14/15 FY15/16 TOTAL

Design* - - - - Construction** 300,000 300,000 300,000 300,000 300,000 1,500,000 TOTAL 300,000 300,000 300,000 300,000 300,000 1,500,000 Jun 16 Apr 09

Cost Projection

Budget Cumulative Budget (Millions) Fiscal Year 4 3 2 1 0 300,000 300,000 300,000 300,000 300,000

budget Summary

Construction contract was awarded in October 2010. Completed 70% of the work in Circus Circus Drive and substantially completed the work in Decatur Boulevard.

FY10/11 Completed Key Milestones

Award Construction Contract – October 2010 Administrative NTP – November 2010 Physical NTP – January 2011

FY11/12 Planned Key Milestones

Substantial Completion – February 2012

· Final Completion – May 2012 Construction Contract – October 2010

Project description

This project includes design and construction for approximately 6,900 feet of sewer pipelines, ranging in diameter from 8 to 24 inches in four locations. Collection system modeling identified these as top priority sewers with some currently at capacity (d/D = 1). Also associated with this project are eight miscellaneous sewers which require manhole repair/replacement, removal of sags, repair of cracks, etc.

As part of the design effort, the consultant completed the standard set of Master Specifications, which will be used for all District projects to ensure consistency in contract documents.

Project Status