3.32 301 Excavation in Hill Area in Soil by Mechanical Means

Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres.

Unit = cum

Taking output = 260 cum a) Labour

Spec. Input ref.

Mazdoor for trimming slopes and helping in excavation etc.

day 6.000 input #VALUE! L-13

b) Machinery

Dozer 80 HP (D-80 A 12)@ 43.28 cum per hour hour 6.000 input #VALUE! P&M-014 Front end loader hour 6.000 input #VALUE! P&M-017 Tipper 5.5cum capacity, 4 trips per hour. hour 12.000 input #VALUE! P&M-048

c) Overhead charges @ input on (a+b) #VALUE!

d) Contractor's profit @ input on (a+b+c) #VALUE!

Cost for 260 cum = a+b+c+d #VALUE!

Rate per cum = (a+b+c+d)/260 #VALUE!

say #VALUE!

Note In case the land on the valley side is barren and there is no objection for disposing of excavated earth on the valley side, the provision of front end loader and tipper shall be deleted as excavated earth shall be disposed off on the valley side.

3.33 301 Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting.

Excavation in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres.

Unit = cum

Taking output = 170 cum a) Labour

Mate day 0.320 input #VALUE! L-12

Mazdoor day 8.000 input #VALUE! L-13

b) Machinery

Dozer 80 HP (D-80 A 12)@ 28.32 cum per hour hour 6.000 input #VALUE! P&M-014 Front end loader hour 7.000 input #VALUE! P&M-017 Tipper 5.5cum capacity, 4 trips per hour. hour 7.000 input #VALUE! P&M-048

c) Overhead charges @ input on (a+b) #VALUE!

d) Contractor's profit @ input on (a+b+c) #VALUE!

Cost for 170 cum = a+b+c+d #VALUE!

Rate per cum = (a+b+c+d)/170 #VALUE!

say #VALUE!

Note In case the land on the valley side is barren and there is no objection for disposing of excavated earth on the valley side, the provision of front end loader and tipper shall be deleted as excavated earth can be disposed off on the valley side.

3.34 301 Excavation in Hilly Areas in Hard Rock Requiring Blasting

Excavation in hilly areas in hard rock requiring blasting, by mechanical means including trimming of slopes and disposal of cut material with all lifts and lead upto 1000 metres.

Unit = cum

Taking output = 170 cum a) Labour

Mate day 0.490 input #VALUE! L-12

Mazdoor day 10.000 input #VALUE! L-13

Driller day 2.000 input #VALUE! L-06

Blaster day 0.250 input #VALUE! L-03

b) Machinery

Dozer 80 HP (D-80 A 12)@ 28.32 cum per hour hour 6.000 input #VALUE! P&M-014 Air compressor 250 cfm with two jack hammer @ 20

cum per hour

hour 5.000 input #VALUE! P&M-001 Front end loader hour 7.000 input #VALUE! P&M-017 Tipper 5.5cum capacity, 4 trips per hour. hour 7.000 input #VALUE! P&M-048

c) Materials

Spec. Input ref.

Electric Detonators @ 1 Detonator for 2 Gelatine sticks of 125 gms each

each 140.000 #VALUE! #VALUE!M-094 /100

d) Overhead charges @ input on (a+b+c) #VALUE!

e) Contractor's profit @ input on (a+b+c+d) #VALUE!

Cost for 170 cum = a+b+c+d+e #VALUE!

Rate per cum = (a+b+c+d+e)/170 #VALUE!

say #VALUE!

Note In case the land on the valley side is barren and there is no objection for disposing of excavated earth on the valley side, the provision of front end loader and tipper shall be deleted as excavated earth can be disposed off on the valley side. In case of hill roads, the altitude effect comes into play. The output of men and machines decreases progressively after 2100 m elevation leading to increase in cost . High altitude effect has been explained in the basic approach.

3.35 Work in Urban Roads

The cost of earth work in urban roads inhabited area will be comparatively higher due to following reasons:

a) There is mixed traffic on urban roads like slow moving hand and animal driven carts, rickshaws, cycles, two/ three wheeler apart from the usual vehicular traffic resulting into traffic jams. This causes loss of working time which may be in the range of 10 -15 per cent

b) There is considerable disruption of traffic adversely affecting the efficiency of the working parties including machines due to congestion caused by pedestrian traffic, local road side venders, parking of vehicles by the road side, encroachments by the shopkeepers and local shops who make use of the berms of the road in front of these shops and unauthorised conversion of road berms into mini local market The output of manpower and machines is substantially reduced due to factors mentioned above.

c) Cost of living in urban areas is comparatively more resulting into higher wages.

d) At times, work is executed during night time due to heavy traffic during day time. This involves extra expenditure by way of making arrangement for lighting and special transport for working parties due to odd hour

In the light of above, the authorities engaged in preparing the cost estimates may exercise their judgment and cater for the additional cost to the extent of 2 to 3 per cent, keeping in view the severity of factors mentioned above. Supporting details for the extra cost based on the actual conditions in specific cases will have to give in justification.

3.36 Suggesti ve

Embankment Construction with Flyash/Pond ash available from coal or lignite burning Thermal Plants as waste material.

Construction of embankment with Flyash conforming to table 1 of IRC: SP: 58 - 2001 obtained from coal or lignite burning thermal power stations as waste material, spread and compacted in layer of 200mm thickness each at OMC, all as specified in IRC: SP: 58-2001 and as per approved plans.

Unit = cum

Taking output = 360 cum a) Labour

Mate day 0.160 input #VALUE! L-12

Mazdoor day 4.000 input #VALUE! L-13

b) Machinery

Hydraulic Excavator 0.9 cum bucket capacity @ 60 cum/hour

hour 6.000 input #VALUE! P&M-026 Tipper 10Tcapacity flyash 360 x 1.2 = 432 tonnes tonne.km 432 x L input #VALUE!Lead =input

km & P&M- 058 Add 10 per cent of cost of carriagefor loading and

unloading

#VALUE! Dozer 80 HP for spreading @ 200 cum/hour hour 1.800 input #VALUE! P&M-014

Spec. Input ref.

Motor Grader for grading @ 100 cum/hour hour 3.600 input #VALUE! P&M-032 Water tanker6 KL capacity hour 12.000 input #VALUE! P&M-060 Vibratory Roller 8-10 tonne @ 100 cum/hour hour 3.600 input #VALUE! P&M-059

c) Overhead charges @ input on (a+b) #VALUE!

d) Contractor's profit @ input on (a+b+c) #VALUE!

Cost for 360 cum = a+b+c+d #VALUE!

Rate per cum = (a+b+c+d)/360 #VALUE!

say #VALUE!

Note 1.As flyash is available free of cost as waste material from