• No se han encontrado resultados

Antecedentes internacionales

In document UNIVERSIDAD NACIONAL DE HUANCAVELICA (página 24-27)

CAPÍTULO II MARCO TEÓRICO

2.1. Antecedentes del estudio

2.1.1. Antecedentes internacionales

All requirements given below are subordinate to customer specific requirements.

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

*If minimum requirements are not met, provide supporting records to justify actual conditions.

Related Molding

System Assessment

Question #

1.4 2.1 2.13

Incoming material assessment procedure, covering onsite testing or acceptance of supplier testing, with criteria (i.e., melt flow, specific gravity).

1.4 2.1 2.13

Incoming components assessment procedure, covering onsite testing or acceptance of supplier testing, with criteria (if applicable).

1.4 2.3 2.11 2.12

Stock rotation system in place for First in/First out (FIFO) and shelf-life.

1.4 2.11

2.12 Environment contamination (dust) controlled (if applicable)

CQI-23

Special Processes: Molding System Assessment

Version 1, 3/2014

Item # Category/Process Steps Type of Control

Minimum Requirement Actual Condition

PROCESS TABLE C - Vacuum Forming

All requirements given below are subordinate to customer specific requirements.

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

*If minimum requirements are not met, provide supporting records to justify actual conditions.

Related Molding

System Assessment

Question #

C2.3 Environment humidity and temperature controlled (if applicable) Automatic

C2.4 Automatic/Manual

C2.5 Plastic Sheet Stacking Manual

3.0 Forming Process

C3.1 Manual

1.4 1.6 2.7 2.11 2.12 1.4

1.6 2.7 2.11 2.12

Partial containers handling to ensure no contamination (closed container, clean environment)

1.4 1.6 2.7 2.11 2.12

1.4 1.15

2.11 There shall be a standardized startup procedure/checklist that defines things to do at start-up

Special Processes: Molding System Assessment

Version 1, 3/2014

PT C 32 of 79

Item # Category/Process Steps Type of Control

Minimum Requirement Actual Condition

PROCESS TABLE C - Vacuum Forming

All requirements given below are subordinate to customer specific requirements.

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

*If minimum requirements are not met, provide supporting records to justify actual conditions.

Related Molding

System Assessment

Question #

C3.2 Production plan (machine, mold, materials, part quantity) Manual

C3.3 Startup check (verify process settings against setup sheet) Automatic / Manual

C3.4 Heating distance (between heater and sheet) Manual

C3.5 Sheet heating time and temperature (heating cycle, intensity) Manual

C3.6 Startup check - Secondary Equipment (trimming, assembly) Manual 1.4

1.15 2.11

2.12 1.4 1.15

2.11 2.12 1.4 1.15

2.11 2.12 1.4 1.15

2.11 2.12 1.4 1.15

2.11 2.12

CQI-23

Special Processes: Molding System Assessment

Version 1, 3/2014

Item # Category/Process Steps Type of Control

Minimum Requirement Actual Condition

PROCESS TABLE C - Vacuum Forming

All requirements given below are subordinate to customer specific requirements.

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

*If minimum requirements are not met, provide supporting records to justify actual conditions.

Related Molding

System Assessment

Question #

C3.7 Sheet forming temperature per film supplier guidelines Automatic/Manual

C3.8 Mold temperature per film supplier guidelines Automatic/Manual

C3.9 Clamping frame closing pressure Automatic

C3.10 Mold close speed Automatic

C3.11 Plug temperature, start time and speed (if applicable) Automatic 1.4

1.15 2.11

2.12 1.4 1.15

2.11 2.12 1.4 1.15

2.11 2.12 1.4 1.15

2.11 2.12 1.4 1.15

2.11 2.12

Special Processes: Molding System Assessment

Version 1, 3/2014

PT C 34 of 79

Item # Category/Process Steps Type of Control

Minimum Requirement Actual Condition

PROCESS TABLE C - Vacuum Forming

All requirements given below are subordinate to customer specific requirements.

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

*If minimum requirements are not met, provide supporting records to justify actual conditions.

Related Molding

System Assessment

Question #

C3.12 Sheet pre-stretching sequence and time (if applicable) Automatic

C3.13 Vacuum level, start time, evacuation speed and duration Automatic

C3.14 Pressure level, start time and duration (if applicable) Automatic

C3.15 Cooling temperature and time Automatic

C3.16 Ejection air (compressed) pressure and time Automatic

1.4 1.15

2.11 2.12 1.4 1.15

2.11 2.12 1.4 1.15

2.11 2.12 1.4 1.15

2.11 2.12 1.4 1.15

2.11 2.12

CQI-23

Special Processes: Molding System Assessment

Version 1, 3/2014

Item # Category/Process Steps Type of Control

Minimum Requirement Actual Condition

PROCESS TABLE C - Vacuum Forming

All requirements given below are subordinate to customer specific requirements.

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

*If minimum requirements are not met, provide supporting records to justify actual conditions.

Related Molding

System Assessment

Question #

C3.17 Manual

C3.18 Shut down procedures Manual

4.0 Quality Control

C4.1 Dimensions Manual

C4.2 Appearance (vs. boundary sample or per instruction) Manual

C4.3 Physical properties (if applicable) Manual

1.4 1.15

2.11 2.12

First piece approval

1.4 1.15

2.11 2.12

1.4 2.11

2.12 1.4

2.11 2.12 1.4

2.11 2.12

Special Processes: Molding System Assessment

Version 1, 3/2014

PT C 36 of 79 Monitoring Frequency

Minimum Requirement Actual Condition

Once per lot

Once per lot

PROCESS TABLE C - Vacuum Forming

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

Observation/

Comments

(Pass / Fail / N/A)

FIFO - per Lot

Shelf life - pull for use

Continuous by controller or manual verification daily

CQI-23

Special Processes: Molding System Assessment

Version 1, 3/2014

Monitoring Frequency

Minimum Requirement Actual Condition

PROCESS TABLE C - Vacuum Forming

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

Observation/

Comments

(Pass / Fail / N/A)

Continuous

Continuous

Continuous by controller or manual verification daily

Start-up and restart after long down time event

Special Processes: Molding System Assessment

Version 1, 3/2014

PT C 38 of 79 Monitoring Frequency

Minimum Requirement Actual Condition

PROCESS TABLE C - Vacuum Forming

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

Observation/

Comments

(Pass / Fail / N/A)

At start-up

At start-up

At start-up, and after long down time event

At start-up, and after long down time event

At start-up, and after long down time event

CQI-23

Special Processes: Molding System Assessment

Version 1, 3/2014

Monitoring Frequency

Minimum Requirement Actual Condition

PROCESS TABLE C - Vacuum Forming

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

Observation/

Comments

(Pass / Fail / N/A)

At start-up, and after long down time event

At start-up, and after long down time event

At start-up, and after long down time event

At start-up, and after long down time event

At start-up, and after long down time event

Special Processes: Molding System Assessment

Version 1, 3/2014

PT C 40 of 79 Monitoring Frequency

Minimum Requirement Actual Condition

PROCESS TABLE C - Vacuum Forming

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

Observation/

Comments

(Pass / Fail / N/A)

At start-up and every 8 hours

At start-up and every 8 hours At start-up, and after long down time event

At start-up, and after long down time event

At start-up, and after long down time event

CQI-23

Special Processes: Molding System Assessment

Version 1, 3/2014

Monitoring Frequency

Minimum Requirement Actual Condition

PROCESS TABLE C - Vacuum Forming

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

Observation/

Comments

(Pass / Fail / N/A)

End of production or run Start-up, and restart after down time event

Per cavity, start-up and once every 8 hours

Per cavity, start-up and once every 8 hours

Per cavity, start-up and once every 8 hours

Special Processes: Molding System Assessment

Version 1, 3/2014

PT D 42 of 79

Item # Category/Process Steps Type of Control

Minimum Requirement Actual Condition

1.0 Receiving Inspection

D1.1 Manual

D1.2 Manual

2.0 Compounding (if applicable)

D2.1 Manual

D2.2 Manual

In document UNIVERSIDAD NACIONAL DE HUANCAVELICA (página 24-27)

Documento similar