• No se han encontrado resultados

Antecedentes nacionales

In document UNIVERSIDAD NACIONAL DE HUANCAVELICA (página 27-32)

CAPÍTULO II MARCO TEÓRICO

2.1. Antecedentes del estudio

2.1.2. Antecedentes nacionales

All requirements given below are subordinate to customer specific requirements.

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

*If minimum requirements are not met, provide supporting records to justify actual conditions.

Related Molding

System Assessment

Question #

1.4 2.1 2.13

Incoming material assessment procedure, covering onsite testing or acceptance of supplier testing, with criteria (i.e., melt flow, specific gravity, temperature recording).

1.4 2.1 2.13

Incoming components assessment procedure, covering onsite testing or acceptance of supplier testing, with criteria (if applicable).

1.4 2.1 2.13

Purging all equipment and feeding system to avoid cross contamination.

CQI-23

Special Processes: Molding System Assessment

Version 1, 3/2014

Item # Category/Process Steps Type of Control

Minimum Requirement Actual Condition

PROCESS TABLE E - Transfer Molding

All requirements given below are subordinate to customer specific requirements.

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

*If minimum requirements are not met, provide supporting records to justify actual conditions.

Related Molding

System Assessment

Question #

E2.2 Manual

3.0 Storage & Handling

E3.1 Automatic/Manual

E3.2 Environment temperature and humidity for storage (if applicable). Automatic

E3.3 Automatic

1.4 2.1 2.13

Compound property verification when applicable

- For rubber and one part epoxy; preform, elongation, tensile strength, compression set, pre-cure rate, or rheology etc.

1.4 2.11 2.12

Stock rotation system in place for First in/First out (FIFO) and shelf-life.

1.4 2.11 2.12 1.4 2.11 2.12

Temperature control during shipment from material supplier to cold storage area in plant (if applicable i.e.; one part epoxies).

Special Processes: Molding System Assessment

Version 1, 3/2014

PT E 58 of 79

Item # Category/Process Steps Type of Control

Minimum Requirement Actual Condition

PROCESS TABLE E - Transfer Molding

All requirements given below are subordinate to customer specific requirements.

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

*If minimum requirements are not met, provide supporting records to justify actual conditions.

Related Molding

System Assessment

Question #

E3.4 Manual

E3.5 Automatic/Manual

E3.6 Automatic/Manual

E3.7 Partial container quantity Automatic/Manual

4.0 Molding Process

1.4 2.11 2.12

Material container remains sealed during warm up to room temperature (supplier recommendation).

1.4 2.11 2.12

Time exposed to room temperature when removed from cold storage area for production. Allowable usage time after room temperature is reached.

1.4 1.6 2.11 2.12

Partial container handling to ensure no contamination (closed container, clean environment)

1.4 1.6 2.11 2.12

CQI-23

Special Processes: Molding System Assessment

Version 1, 3/2014

Item # Category/Process Steps Type of Control

Minimum Requirement Actual Condition

PROCESS TABLE E - Transfer Molding

All requirements given below are subordinate to customer specific requirements.

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

*If minimum requirements are not met, provide supporting records to justify actual conditions.

Related Molding

System Assessment

Question #

E4.1 Manual

E4.2 Production plan (machine, mold, materials, part style) Manual

E4.3 Startup check (verify process settings against setup sheet) Manual

E4.4 Automatic

E4.5 Verification of preform size, or shape, or both manual

1.4 1.15

2.11 2.12

There shall be a standardized startup procedure/checklist that defines things to do at start-up

1.4 1.15

2.11 2.12 1.4 1.15

2.11 2.12 1.4 1.15

2.11 2.12

Mold cavity temperatures; variation between each cavity and set temperatures

1.4 1.15

2.11 2.12

Special Processes: Molding System Assessment

Version 1, 3/2014

PT E 60 of 79

Item # Category/Process Steps Type of Control

Minimum Requirement Actual Condition

PROCESS TABLE E - Transfer Molding

All requirements given below are subordinate to customer specific requirements.

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

*If minimum requirements are not met, provide supporting records to justify actual conditions.

Related Molding

System Assessment

Question #

E4.6 Automatic

E4.7 Fill - Fill time and peak pressure Automatic

E4.8 Hold - Hold pressure and hold time Automatic

E4.9 Cure Time Automatic

E4.10 Mold Closing speed Automatic

1.4 1.15

2.11 2.12

Plasticization - Temperature (resin chamber), Transfer Speed, and Transfer Pressure

1.4 1.15

2.11 2.12 1.4 1.15

2.11 2.12 1.4 1.15

2.11 2.12 1.4 1.15

2.11 2.12

CQI-23

Special Processes: Molding System Assessment

Version 1, 3/2014

Item # Category/Process Steps Type of Control

Minimum Requirement Actual Condition

PROCESS TABLE E - Transfer Molding

All requirements given below are subordinate to customer specific requirements.

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

*If minimum requirements are not met, provide supporting records to justify actual conditions.

Related Molding

System Assessment

Question #

E4.11 Cavity surface cleanliness (no debris) manual

E4.12 Pre-heat of components - If Insert molding required Automatic

E4.13 Automatic

E4.14 Hold - Cavity pressure (if applicable) Automatic

E4.15 Part weight (if applicable) Manual

1.4 1.15

2.11 2.12 1.4 1.15

2.11 2.12 1.4 1.15

2.11 2.12

Pre-heat of resin pellets or compound - If applicable (per manufacturers recommendations)

1.4 1.15

2.11 2.12 1.4 1.15

2.11 2.12

Special Processes: Molding System Assessment

Version 1, 3/2014

PT E 62 of 79

Item # Category/Process Steps Type of Control

Minimum Requirement Actual Condition

PROCESS TABLE E - Transfer Molding

All requirements given below are subordinate to customer specific requirements.

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

*If minimum requirements are not met, provide supporting records to justify actual conditions.

Related Molding

System Assessment

Question #

E4.16 Manual

E4.17 Shut down procedures Manual

5.0 Quality Control

E5.1 Part weight Manual

E5.2 Dimensions Manual

1.4 1.15

2.11 2.12

First piece approval

1.4 1.15

2.11 2.12

1.4 2.11

2.12 1.4

2.11 2.12

CQI-23

Special Processes: Molding System Assessment

Version 1, 3/2014

Item # Category/Process Steps Type of Control

Minimum Requirement Actual Condition

PROCESS TABLE E - Transfer Molding

All requirements given below are subordinate to customer specific requirements.

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

*If minimum requirements are not met, provide supporting records to justify actual conditions.

Related Molding

System Assessment

Question #

E5.3 Appearance (vs. boundary sample or per instruction) Manual

E5.4 Physical properties (if applicable) Manual

1.4 2.11

2.12 1.4

2.11 2.12

Special Processes: Molding System Assessment

Version 1, 3/2014

PT E 64 of 79 Monitoring Frequency

Minimum Requirement Actual Condition

Once per lot

Once per lot

PROCESS TABLE E - Transfer Molding

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

Observation/

Comments

(Pass / Fail / N/A)

End of run or long downtime, material change

CQI-23

Special Processes: Molding System Assessment

Version 1, 3/2014

Monitoring Frequency

Minimum Requirement Actual Condition

PROCESS TABLE E - Transfer Molding

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

Observation/

Comments

(Pass / Fail / N/A)

Per production lot

FIFO - per Lot

Shelf life - pull for use

Continuous monitoring by controller or manual verification daily

Continuous monitoring (i.e., by chart recorder)

Special Processes: Molding System Assessment

Version 1, 3/2014

PT E 66 of 79 Monitoring Frequency

Minimum Requirement Actual Condition

PROCESS TABLE E - Transfer Molding

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

Observation/

Comments

(Pass / Fail / N/A)

Continuous

Per Container

Time stamp on container from time out of cold storage to when container is opened

Continuous monitoring by controller or manual verification

CQI-23

Special Processes: Molding System Assessment

Version 1, 3/2014

Monitoring Frequency

Minimum Requirement Actual Condition

PROCESS TABLE E - Transfer Molding

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

Observation/

Comments

(Pass / Fail / N/A)

At start-up

Continuous

Start-up and restart after long down time event

At start-up, and after long down time event

Continuous, at start-up and after down time event.

Special Processes: Molding System Assessment

Version 1, 3/2014

PT E 68 of 79 Monitoring Frequency

Minimum Requirement Actual Condition

PROCESS TABLE E - Transfer Molding

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

Observation/

Comments

(Pass / Fail / N/A)

Continuous

Continuous

Continuous

Continuous

Continuous

CQI-23

Special Processes: Molding System Assessment

Version 1, 3/2014

Monitoring Frequency

Minimum Requirement Actual Condition

PROCESS TABLE E - Transfer Molding

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

Observation/

Comments

(Pass / Fail / N/A)

Continuous

Continuous

Continuous

Continuous

Once every 8 hours*

Special Processes: Molding System Assessment

Version 1, 3/2014

PT E 70 of 79 Monitoring Frequency

Minimum Requirement Actual Condition

PROCESS TABLE E - Transfer Molding

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

Observation/

Comments

(Pass / Fail / N/A)

End of production or run Start-up, and restart after down time event

Start-up and once every 4 hours. For safety critical parts, start-up and once every hour

Per cavity, start-up and once every 8 hours

CQI-23

Special Processes: Molding System Assessment

Version 1, 3/2014

Monitoring Frequency

Minimum Requirement Actual Condition

PROCESS TABLE E - Transfer Molding

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

Observation/

Comments

(Pass / Fail / N/A) Per cavity, start-up and once

every 8 hours

Per cavity, start-up and once every 8 hours

Version 1, 3/2014

PT F 72 of 79

Item # Category/Process Steps Type of Control Monitoring Frequency

Minimum Requirement Actual Condition Minimum Requirement Actual Condition

1.0 Receiving Inspection

F1.1 Manual Once per lot

F1.2 Manual Once per lot

2.0 Storage & Handling

F2.1 Automatic/Manual

F2.2 Environment temperature and humidity controlled (if applicable) Automatic

F2.3 Automatic/Manual Continuous

F2.4 Partial container quantity Automatic/Manual Per Container

PROCESS TABLE F - Extrusion

All requirements given below are subordinate to customer specific requirements.

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

*If minimum requirements are not met, provide supporting records to justify actual conditions.

Related

Incoming material assessment procedure, covering onsite testing or acceptance of supplier testing, with criteria (i.e., melt flow, specific gravity).

1.4 2.1 2.13

Incoming components assessment procedure, covering onsite testing or acceptance of supplier testing, with criteria (if applicable).

1.4 2.11 2.12

Stock rotation system in place for First in/First out (FIFO) and

shelf-life FIFO - per Lot

Shelf life - pull for use

1.4 2.11 2.12

Continuous monitoring by controller or manual verification daily 1.4

1.6 2.11 2.12

Partial container handling to ensure no contamination (closed container, clean environment)

1.4 1.6 2.11 2.12

CQI-23 Special Processes: Molding System Assessment

Version 1, 3/2014

Item # Category/Process Steps Type of Control Monitoring Frequency

Minimum Requirement Actual Condition Minimum Requirement Actual Condition

PROCESS TABLE F - Extrusion

All requirements given below are subordinate to customer specific requirements.

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

*If minimum requirements are not met, provide supporting records to justify actual conditions.

Related 3.0 Material Drying (If Applicable)

F3.1 Dryer temperature per resin manufacturer guidelines (per material) Automatic

F3.2 Dryer time per resin manufacturer guidelines (per material) Manual

F3.3 Drying equipment (dryer dedicated or clean procedure in place) Manual Material change

F3.4 Dew point Automatic Continuous by controller

F3.5 Moisture content Manual

4.0 Recycle/Regrind Material (if Applicable)

F4.1 Automatic

F4.2 Regrind equipment (dedicated or cleaning procedure in place) Manual Material change

1.4 2.11 2.12

Start-up and continuous by controller.

1.4 2.11 2.12

Start-up and once every 8 hours

Recycle ratio (per print, inspection standard or manufacturer

guidelines). Verified by feed pressure, weight or volume. Once every 8 hours and at

every part change-over

1.4 1.11

2.11 2.12

Version 1, 3/2014

PT F 74 of 79

Item # Category/Process Steps Type of Control Monitoring Frequency

Minimum Requirement Actual Condition Minimum Requirement Actual Condition

PROCESS TABLE F - Extrusion

All requirements given below are subordinate to customer specific requirements.

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

*If minimum requirements are not met, provide supporting records to justify actual conditions.

Related

F4.3 Fines management (de-dusting) Automatic/Manual Material change

F4.4 Automatic/Manual Start-up and continuous

5.0 Color Management (If Applicable)

F5.1 Pigment blending - percent loading Automatic/Manual Start-up and continuous

F5.2 Color change procedure Manual At color change

6.0 Extrusion Process

F6.1 Manual

F6.2 Production plan (machine, mold, materials, part quantity) Manual

F6.3 Manual

F6.4 Verify secondary equipment Manual

1.4

Prevention of contamination when transporting or feeding regrind to the extrusion machine.

1.4

There shall be a standardized startup procedure/checklist that

defines things to do at start-up Start-up and restart after long

down time event

1.4 1.15

2.11 2.12

Start-up and restart after long down time event

1.4 1.15

2.11 2.12

Verify molding machine settings including but not limited to barrel and head/die temperature settings, screw speed, screw cooling temperature (if applicable), as well as settings for down stream processes

Start-up and restart after long down time event

1.4 1.15

2.11 2.12

Start-up and restart after long down time event

CQI-23 Special Processes: Molding System Assessment

Version 1, 3/2014

Item # Category/Process Steps Type of Control Monitoring Frequency

Minimum Requirement Actual Condition Minimum Requirement Actual Condition

PROCESS TABLE F - Extrusion

All requirements given below are subordinate to customer specific requirements.

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

*If minimum requirements are not met, provide supporting records to justify actual conditions.

Related

F6.5 Mold surface temperature Automatic/Manual

F6.6 Extrusion Head Pressure Automatic Start-up and continuous

F6.7 Vacuum level (if applicable) Automatic Start-up and continuous

F6.8 Coolant inlet temperature (if applicable) Automatic Start-up and continuous

F6.9 Manual

F6.10 Manual End of run or long downtime

F6.11 Shut down procedures Manual End of production or run

1.4 1.15

2.11 2.12

Continuous if automatic, or at start-up and after down time event.

First piece approval Start-up, and restart after

down time event

1.4 1.15

2.11 2.12

Material purge/evacuation of barrel - included in unplanned and downtime procedures

1.4 1.15

2.11 2.12

Version 1, 3/2014

PT F 76 of 79

Item # Category/Process Steps Type of Control Monitoring Frequency

Minimum Requirement Actual Condition Minimum Requirement Actual Condition

PROCESS TABLE F - Extrusion

All requirements given below are subordinate to customer specific requirements.

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

*If minimum requirements are not met, provide supporting records to justify actual conditions.

Related

7.0 Quality Control

F7.1 Thickness Manual

F7.2 Layer thickness/thickness uniformity (multi-layer only) Manual

F7.3 Layer adhesion (multi-layer only) Manual

F7.4 Dimensions Manual

F7.5 Appearance (vs. boundary sample or per instruction) Manual

F7.6 Physical properties (if applicable) Manual

1.4 2.11

2.12

Per cavity, start-up and once every 8 hours. For safety critical parts, start-up and once every hour

1.4 2.11

2.12

Per cavity, start-up and once every 8 hours. For safety critical parts, start-up and once every 4 hours.

1.4 2.11

2.12

Per cavity, start-up and once every 8 hours. For safety critical parts, start-up and once every hour 1.4

2.11 2.12

Per cavity, start-up and once every 8 hours

1.4 2.11

2.12

Per cavity, start-up and once every 8 hours

1.4 2.11

2.12

Per cavity, start-up and once every 8 hours

CQI-23 Special Processes: Molding System Assessment

Version 1, 3/2014

Item # Equipment Type Extrusion Verification Frequency Comment

1.0 PROCESS EQUIPMENT

G1.1 2.14 Mold Temperature Controller X X X X X X Once per shift N/A

G1.2 2.14 Filters, if applicable X X X X X X N/A

G1.3 2.14 Thermocouple X X X X X X Per Preventive Maintenance Annual

G1.4 2.14 Injection Mold Machine X Per Preventive Maintenance Every 5 years

G1.5 2.14 Mold X X X X X X Per Preventive Maintenance N/A

G1.6 2.14 Blow mold machine X Per Preventive Maintenance Every 5 years

G1.7 2.14 Vacuum molding machine X Per Preventive Maintenance N/A

G1.8 2.14 Compression molding machine X X Per Preventive Maintenance N/A

G1.9 2.14 Extrusion machine X Per Preventive Maintenance Every 5 years

G1.10 2.14 Dryer X X X X Per Preventive Maintenance N/A

G1.11 2.14 Regrinder X X X Per Preventive Maintenance N/A

G1.12 2.14 Hot Runner Controller X Per Preventive Maintenance N/A

G1.13 2.14 Cavity Pressure Sensor X Per Preventive Maintenance N/A

G1.14 2.14 Hydraulic Pressure Transducer X X Per Preventive Maintenance N/A

G1.15 2.14 X X Per Preventive Maintenance N/A

PROCESS TABLE G - Equipment

All requirements given below are subordinate to customer specific requirements.

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

* When historical results show capability, test frequency may be reduced.

Related Molding System

Assessment Question #

Injection Molding Blow

Molding Vacuum

Forming Compression

Molding Transfer Molding

Calibration / Certification Frequency *

Included in Preventative Maintenance Plan

Once per month or per preventive maintenance

Valve Gate Controller, if applicable

Version 1, 3/2014

PT G 78 of 79

Item # Equipment Type Extrusion Verification Frequency Comment

PROCESS TABLE G - Equipment

All requirements given below are subordinate to customer specific requirements.

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

* When historical results show capability, test frequency may be reduced.

Related Molding System

Assessment Question #

Injection Molding Blow

Molding Vacuum

Forming Compression

Molding Transfer Molding

Calibration / Certification Frequency *

Included in Preventative Maintenance Plan

2.0 SECONDARY EQUIPMENT

G2.1 2.14 X X X X Per Preventive Maintenance N/A

G2.2 2.14 Conveyers X X X X X X Per Preventive Maintenance N/A

G2.3 2.14 Degater/Trim Operation X X X X X X Per Preventive Maintenance N/A

G2.4 2.14 Cutter X Per Preventive Maintenance N/A

G2.5 2.14 Robot X X X X X Per Preventive Maintenance At Installation

G2.6 2.14 Oven, if applicable X X X X Per Preventive Maintenance Annual

G2.7 2.14 Cooling Fan, if applicable X X Per Preventive Maintenance Annual

G2.8 2.14 End of arm tooling X X X X X Per Preventive Maintenance N/A

3.0

G3.1 2.14 Cure Testing, if applicable X X Per lot Annual

G3.2 2.14 Leak Testing, if applicable X X X At start up and per shift Every 6 months

G3.3 2.14 Color X X Before each use Annual

G3.4 2.14 Gloss X X Before each use Annual

G3.5 2.14 Weight X X X At start up Annual

G3.6 2.14 Dimensions X X X X X X At start up Every 6 months

G3.7 2.14 Moisture X X X X X X Per Manufacturer Guidelines Every 6 months

G3.8 2.14 Performance, if applicable X X X X X X Per Manufacturer Guidelines Annual

Generic fixtures (cooling, heat forming, if applicable)

MINIMUM REQUIRED TESTING CAPABILITY

CQI-23 Special Processes: Molding System Assessment

Version 1, 3/2014

Item # Category/Process Steps Monitoring Frequency Observation/Comments

Dimension, Weight, Appearance, Minimum Requirement Actual Condition (Pass / Fail / N/A)

1.0 General

Dimensions Appearance Performance

H1.1 100%

H1.2 1.4

H1.3 1.4 Cracks, Weld line/Knit lines, and Whitening/ stress mark First off and last off

H1.4 1.4 Part identification First off

H1.5 1.4 Manufacturing information

H1.6 1.4 Dimensional check (e.g., Go-no go, Plug and Ring gage) First off and once per shift

H1.7 1.4 Wall thickness Per process table

H1.8 1.4 General - Weight, Resin, Components, Porosity/Voids (if applicable) First off

H1.9 1.4 Performance Per customer specifications

H1.10 1.4 Environmental Per customer specifications

PROCESS TABLE H - Part Inspection and Testing

All requirements given below are subordinate to customer specific requirements.

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to specifications or other requirements.

Note that not all tests are applicable to all molding processes.

Related Molding System Assessment

Question #

1.42.9 Procedures are in place to prevent damage to the finish or part during the inspection and packaging processes

Appearance (flash, color and gloss, short shots, splay/burns, blister, sink marks, gate vestige, and other molding defects) of the molding shall be verified per specification and applications manual

First off by quality and 100%

by operator

Daily Production Meeting Review

In document UNIVERSIDAD NACIONAL DE HUANCAVELICA (página 27-32)

Documento similar