Capacity Load:

SAP menu Logistics ->Production -> Capacity Planning -> Evaluation->Work Center View->Load

Transaction code CM01

In this transaction, one can see the weekly capacity load of a work center. Enter the Work center code, TJ01

Enter Plant, TSMU

Press the Standard overview button at the top.

Production Planning User Manual Version 1.0

The above screen shows, the capacity requirements( equipment hours); available equipment hours; capacity load( % of total capacity); Remaining available equipment hours.

You can pick the required week by ticking the checkbox on the left side of that row. After, selecting, press the Cap. details/ period.

Production Planning User Manual Version 1.0

In this screen, you will see the detailed display of individual load elements and the source of these load(s) in the column PeggedRqmt. Sources are planned orders & production orders.

Production Planning User Manual Version 1.0

Production Planning User Manual Version 1.0

Now in the same transaction, after entering Work center & Plant, press the button

Variable overview.

Production Planning User Manual Version 1.0

In this screen, you can distinguish the group into Wk. orders (Production orders); Pl. orders( Planned orders) and sum of the two, etc.

Production Planning User Manual Version 1.0 12 CAPACITY OVERLOAD:

SAP menu Logistics ->Production->Capacity Planning->Evaluation-> Work Center view->Overload

Transaction code CM05

Production Planning User Manual Version 1.0

You can see in this screen that the system displays the weeks in which there is capacity overload.

Production Planning User Manual Version 1.0

13

CAPACITY LEVELING- WORK CENTER VIEW( TABULAR):

SAP menu Logistics ->Production->Capacity Planning->Leveling-> Work Center view->Planning Table- (Tabular)

Transaction code CM22

Enter the Work Center, TJ01 Enter the Plant, TSMU

Press the filter (funnel) button at the top.

Production Planning User Manual Version 1.0

Choose the Order Cat. as 1 (which means only Production Orders will be displayed) You can also further filter your criteria with Order, 1000017

You press the execute (clock) button.

Production Planning User Manual Version 1.0

In the top section, tick the checkbox at the left side of the row of the Work center capacity 001, which is Equipment Hrs.

Now, under the Requirements section beneath, tick the checkboxes at the left side for all the rows relevant for dispatching. You can see, each operation, operations of

order no. 1000017. We are dispatching the capacities viz. Equipment Hrs.(001).

Press the Dispatch manually button at the top.

[Note: Please recollect whilst creating the work center we had indicated that although these 2 capacities are used for dispatching, only Equipment Hrs. is used for Scheduling the work center in the time dimension.]

Production Planning User Manual Version 1.0

You will get this pop-up. In this, tick checkbox at the left side of Equipment Hrs. row.

Enter the new desired scheduled production dates/ time viz. Start 20.03.2008 at

12:45 hrs. and Finish 20.03.2008 by 24:00 hrs.

Press the Dispatch button at the bottom.

Production Planning User Manual Version 1.0

Now, we check the scheduling results by clicking Extras-> Log-> Planning

Production Planning User Manual Version 1.0

The above is the Planning message box. It says that there are 3 Information

messages; 1 warning messages and no error or termination messages. Former 2

are acceptable but not the latter two.

Click on the right side of Warning messages.

Production Planning User Manual Version 1.0

This screen shows all the 3 messages.

Production Planning User Manual Version 1.0

Production Planning User Manual Version 1.0

Production Planning User Manual Version 1.0

Production Planning User Manual Version 1.0

Production Planning User Manual Version 1.0

Production Planning User Manual Version 1.0

Production Planning User Manual Version 1.0

14 CAPACITY LEVELING (GRAPHICAL)

SAP menu Logistics ->Production->Capacity Planning->Leveling-> Work Center view->Planning Table- (Graphical)

Transaction code CM21

It is ditto same as that of Tabular form. Enter Work Center- TJ01

Enter Plant- TSMU

Press the filter ( funnel) button.

Production Planning User Manual Version 1.0

Here filter the desired criteria you want. Choose Order Cat.-1 from the dropdown. Enter Order- 1000017

Press execute (clock) button at the top.

Production Planning User Manual Version 1.0

The order “slabs” are in red. Choose each operation and drag it along the desired date in the X axis time graph by a green color vertical line.

Production Planning User Manual Version 1.0

Now we have scheduled it to new desired dates, operation by operation.

Production Planning User Manual Version 1.0

The above is the planning log message what we get.

15 CAPACITY LEVELING (ORDERS)

Production Planning User Manual Version 1.0 Here, we can level& schedule

SAP menu Logistics->Production->Capacity Planning->Leveling- >Order view->Planning Table- Order View (Tabular)

Transaction code CM23

Here, enter Order nos. 1000000 to 1000017

Press the filter button at the top, if you want to refine your criteria.

Production Planning User Manual Version 1.0

Enter the filtering data, if any. Press the execute (clock) button.

Production Planning User Manual Version 1.0

Here, we are selecting the rows of order no. 1000005. Press the Dispatch Manually button at the top.

Production Planning User Manual Version 1.0

You will get this pop-up. Choose the work center where you want to dispatch and schedule this order in.

Press the Dispatch Manually button at the bottom left of the pop-up.

Production Planning User Manual Version 1.0

…Now we will resume our Order execution 1000017 from where we left.

Remember, we have dispatched & scheduled our order with Start. at 07:00 hrs, on 20.03.2008 & Finish by 11.41 hrs. on 20.03.2008.

Having dispatched this order to new scheduled dates manually, we will release this production order. Please remember after releasing & saving the order, one cannot change the order parameters anymore.

Press the Release (Green colour flag) button at the top left.

Production Planning User Manual Version 1.0

Order has been Released Double click on the Status line.

Production Planning User Manual Version 1.0

You can see that our order now has the Released status. Click the back (arrow) button to go to main header screen.

Production Planning User Manual Version 1.0

Now, the most important step: Press the save button at the top.