• No se han encontrado resultados

El Rito Malévolo de Hekate

In document Temple of the Black Light Espanol (página 96-102)

ESSIP Plan Edition 2012

Consultation & Approval

Working arrangement in charge: COM Steering Group (CSG) and PENS Steering Group (PSSG)

Outline description approved in: -

Latest objective review at expert level in: 04/2012

Commitment decision body: Provisional Council (PC)

Objective approved/endorsed in: 07/2009

Latest change to objective approved/endorsed in: 07/2012

Expected performance benefits

Safety : N/A.

Capacity : N/A.

Cost-effectiveness : More cost efficient as X.25 maintenance costs are increasing while TCP/IP costs are lower.

Environment : N/A.

Security : N/A

Detailed SloA descriptions

COM09-REG01 Notify relevant National ANSPs of the mandate to migrate to IPv6 Start:09/2009 Finish:07/2010

Action by : National Regulatory Authorities

Description & purpose : Not all ANSPs of a given State require connecting international or regional data networks or services.

Have to decide which of the National ANSPs must comply with Commission Regulation (European Communities) No 633/2007 of 7 June 2007 laying down requirements for the application of a Flight Message Transfer Protocol (FMTP). Regulators will then notify their relevant ANSPs of the mandate to migrate to IPv6 and inform the European Commission and the EUROCONTROL Agency accordingly.

This action should take account of the controlling military units providing services to general air traffic.

Finalisation criteria : The national Regulator has provided the European Commission and the EUROCONTROL Agency, e.g. through the LSSIP document, with the list of National ANSPs & controlling military units providing services to general air traffic, mandated to migrate to IPv6.

COM09-REG02 Inform the European Commission and the EUROCONTROL Agency of the

planned means & dates of compliance of the National ANSPs Start:09/2009 Finish:12/2010

Action by : National Regulatory Authorities

Description & purpose : Based on the output of COM09-ASP01, inform the European Commission and the EUROCONTROL Agency of the planned means & dates of compliance of the ANSPs identified within COM09-REG01.

Finalisation criteria : The national Regulator has provided the European Commission and the EUROCONTROL Agency, e.g. through the LSSIP documents, with the planned means & dates of compliance of their ANSPs.

COM09-ASP01 Migrate international or regional X.25 data networking facilities and/or services

to IP Start:09/2009 Finish:07/2010

Action by : ANS Providers

Description & purpose : - Stipulate to the national regulator the planned means of compliance with Commission Regulation No 633/2007 of 7 June 2007 laying down requirements for the application of a Flight Message Transfer Protocol (FMTP and the services concerned).

- Prepare internal business and safety cases for their National Regulator. - Stipulate the target date of compliance.

Finalisation criteria : The EUROCONTROL Agency (if PENS selected) informed by the National regulator of: - The planned means of compliance;

- The target date of compliance.

COM09-ASP03 Migrate international or regional X.25 data networking facilities and/or services

to IPv6 Start:01/2006 Finish:12/2014

Action by : ANS Providers

Description & purpose : Implement or purchase IP network services to enable international communication exchange on IPS based protocol. Implement the necessary IPv4/IPv6 translation device if required.

COM09

Migrate ground international or regional X.25 data networks or services to the Internet Protocol (IP)

ESSIP Plan Edition 2012

Finalisation criteria : International and regional ATM applications stipulated to make use of IPv6 networks are in operation under IPv6.

COM09-AGY01 Report on PENS performance Start:09/2009 Finish:12/2011

Action by : EUROCONTROL Agency

Description & purpose : Based on PENS Users' Service Level Agreement (SLA) reports, establish a yearly consolidated report to allow effective management of the PENS Contract.

Finalisation criteria : This action will be stated finalised after acceptation by the PSSG of the PENS performance reports covering the first two years.

PAGE LEFT INTENTIONALLY BLANK

SESAR Active ECAC

COM10

Migrate from AFTN to AMHS

REG ASP MIL APO USE INT IND

ESSIP Plan Edition 2012

Description & purpose

The purpose of this objective is to enable EATM Network-wide support of a specific profile of the Extended level of service of the ATSMHS (ATS Message Handling Service), as defined by ICAO. An initial transition step supporting migration from the AFTN to the Basic ATSMHS level of service is foreseen.

AFTN, complemented in Europe by the CIDIN, has provided an effective store-and-forward messaging service for the conveyance of text messages, using character-oriented procedures, for many years. However AFTN / CIDIN technology is now becoming obsolescent, and is not sufficiently flexible to support future messaging requirements. It is intended that existing AFTN and CIDIN users and systems will transition to more modern technology, using the ATSMHS application, defined by ICAO to replace the AFTN telegraphic style of working with a store-and-forward Message Handling System based on international Standards and providing enhanced functionality.

This implementation objective makes use of the EUROCONTROL Specification 0136, Edition number 2.0 "EUROCONTROL specification on the Air Traffic Services Message Handling System (AMHS)" recognised as Community Specification in the Official Journal of the European Union (ref. OJ C 323, 31.12.2009, p. 24), to help the ground ATS Messaging systems of the EATM Network to meet the essential requirements for interoperability mandated by Commission Regulation (EC) No 552/2004. In

application of Article 4 of Commission Regulation (EC) No 552/2004, compliance with the essential requirements for interoperability shall be presumed for AMHS systems, together with the associated procedures, that meet the AMHS Community Specification. Note: For global AMHS address management ICAO has strongly recommended the use of the ATS Messaging Management Centre (AMC) implemented by EUROCONTROL under the aegis of the ICAO EUR Office (Paris) to every ICAO Contracting State worldwide, as soon as there is an AMHS project or implementation in that State.

Applicable area(s) Operational capability dates FOR THIS OBJECTIVE

Initial operational capability: 12/2011 All ECAC States

Full operational capability: 12/2014

References

European ATM Master Plan relationship

Enabler - [CTE-C10]-AMHS

OI step - [AOM-0202]-Enhanced Real-time Civil-Military Coordination of Airspace Utilisation (Step to be reviewed)

Applicable legislation

Council Decision of 30 March 2009 endorsing the European Air traffic Management Master Plan of the Single European Sky ATM Research (SESAR) project (2009/320/EC)

Applicable ICAO Annexes and other references

Standards and Recommended Practices (SARPs) for the ATSMHS application are specified in ICAO Annex 10 to the Convention on International Civil Aviation (Annex 10 Volume II, Chapter 4.6 and Volume III, Part I, Chapter 3.5.3). These SARPs refer to detailed specifications in the relevant technical Manual (ICAO Doc 9880 Part IIB).

Stakeholder Lines of Action (SloA )

SloA ref. Title Start Finish

COM10-ASP01 Implement AMHS capability (Basic ATSMHS) and gateway facilities to AFTN

01/2002 12/2011

COM10-ASP02 Implement regional boundary gateways 01/2002 12/2011 ▲

COM10-ASP03 Enhance AMHS capability (Extended ATSMHS) 01/2012 12/2014 ▲

COM10-ASP04 Ensure the conformity of AMHS systems and associated procedures 01/2002 12/2014 ▲

COM10-ASP05 Organise personnel awareness and training 01/2002 12/2014 ▲

COM10-ASP06 Participate in AMC activities for ATS Messaging Management 01/2007 12/2014

COM10-IND01 Ensure the conformity of AMHS systems 01/2002 12/2014

In document Temple of the Black Light Espanol (página 96-102)