• No se han encontrado resultados

El Rito Sacrificatorio de lo Once Llamas

In document Temple of the Black Light Espanol (página 69-75)

Description of finalised SLoAs is available on the EIPR website at http://www.eurocontrol.int/articles/essip-plan/

Consultation & Approval

Working arrangement in charge: SAFETY / SPIN SG

Outline description approved in: 03/2012

Latest objective review at expert level in: 04/2012

Commitment decision body: Provisional Council (PC)

Objective approved/endorsed in: 07/2006

Latest change to objective approved/endorsed in: 07/2012

Expected performance benefits

Safety : The systematic presentation of imminent and actual unauthorized penetrations into airspace volumes to controllers

ahead of their occurrence, as provided by APW, is a major safety assurance tool.

Capacity : N/A

Cost-effectiveness : Standardisation of APW enables cost-effective use of scarce resources and is in particular a critical success factor for

smaller ASP.

ATC02.5

Implement ground based safety nets - Area Proximity Warning - level 2

ESSIP Plan Edition 2012

Environment : N/A

Security : N/A

Detailed SloA descriptions

ATC02.5-ASP01 Implement the APW function Start:01/2009 Finish:12/2016

Action by : ANS Providers

Description & purpose : Put into service ground-based safety tool systems supporting the APW function in En-Route airspace, applicable TMAs and Military ATC units providing surveillance services.

Notes : this SLoA is linked to ER APP ATC 133

Supporting material(s) : EUROCONTROL - SPEC 124 - EUROCONTROL Specification for Area Proximity Warning - Edition 0.5 / 19-05-2009

Url : http://www.eurocontrol.int/safety-nets/public/standard_page/apw_01.html

Finalisation criteria : 1 - Ground systems upgraded to support the APW function.

2 - The technical file (TF) with evidences of compliance and the EC declaration of verification of systems (DoV) has been delivered to the competent National Supervisory Authority (NSA).

3 - APW function ready for operational use.

ATC02.5-ASP02 Align ATCO training with the use of APW ground-based safety tools Start:01/2009 Finish:12/2016

Action by : ANS Providers

Description & purpose : Train operational staff in the use of APW. The tasks to be done are as follows: - Develop a training package (material);

- Update the training plans;

- Determine staff population to be trained; - Apply the training plans.

Supporting material(s) : EUROCONTROL - SPEC 124 - EUROCONTROL Specification for Area Proximity Warning - Edition 0.5 / 19-05-2009

Url : http://www.eurocontrol.int/safety-nets/public/standard_page/apw_01.html

Finalisation criteria : 1 - The training plans have been updated and a training package has been developed by the ANSP for the use of APW functions.

SESAR Active ECAC

ATC02.6

Implement ground based safety nets - Minimum Safe Altitude Warning - level 2

REG ASP MIL APO USE INT IND

ESSIP Plan Edition 2012

Description & purpose

Implement and make operational use of the MSAW ground based safety net.

Minimum Safe Altitude Warning (MSAW) is intended to warn the air traffic controller (ATCO) about the increased risk of controlled flight into terrain by generating, in a timely manner, an alert of aircraft proximity to terrain or obstacles.

Terrain and traffic characteristics can lead to a significant safety risk that can be mitigated by this tool.

Note:(1) Military ATC authorities are invited to consider implementation of MSAW level 2 when providing ATS surveillance services to GAT (2) Existing draft EUROCONTROL Specification for MSAW could be used as guidance material (ref. supporting material of individual SLoAs)

Applicable area(s) Operational capability dates FOR THIS OBJECTIVE

All ECAC States

Selected portions of airspace in which ATS surveillance services are provided. Deployment according to local needs (e.g.: terrain and traffic characteristics as identified by concerned stakeholders).

Initial operational capability: 01/2009

Full operational capability: 12/2016

References

European ATM Master Plan relationship

OI step - [CM-0801]-Ground Based Safety Nets (TMA, En Route)

Applicable legislation

Council Decision of 30 March 2009 endorsing the European Air traffic Management Master Plan of the Single European Sky ATM Research (SESAR) project (2009/320/EC)

Applicable ICAO Annexes and other references

None

Stakeholder Lines of Action (SloA )

SloA ref. Title Start Finish

ATC02.6-REG01 Approve EUROCONTROL Specification for MSAW DELETED ATC02.6-ASP01 Implement the MSAW function 01/2009 12/2016

ATC02.6-ASP02 Align ATCO training with the use of MSAW ground-based safety tools 01/2009 12/2016

ATC02.6-INT01 Amend ICAO documentation if required DELETED ATC02.6-AGY01 Produce a EUROCONTROL Specification for MSAW DELETED

▲ Applicable to the military.

Description of finalised SLoAs is available on the EIPR website at http://www.eurocontrol.int/articles/essip-plan/

Consultation & Approval

Working arrangement in charge: SAFETY / SPIN SG

Outline description approved in: 03/2012

Latest objective review at expert level in: 04/2012

Commitment decision body: Provisional Council (PC)

Objective approved/endorsed in: 07/2006

Latest change to objective approved/endorsed in: 07/2012

Expected performance benefits

Safety : The systematic presentation of possible infringements of minimum safe altitude to controllers ahead of their occurrence,

as provided by MSAW, is a major safety contribution.

Capacity : N/A

Cost-effectiveness : Standardisation of MSAW enables cost-effective use of resources and is in particular a critical success factor for smaller

ANSP.

Environment : N/A

Security : N/A

ATC02.6

Implement ground based safety nets - Minimum Safe Altitude Warning - level 2

ESSIP Plan Edition 2012

Detailed SloA descriptions

ATC02.6-ASP01 Implement the MSAW function Start:01/2009 Finish:12/2016

Action by : ANS Providers

Description & purpose : Put into service ground-based safety tool systems supporting the MSAW function.

Notes : this SLoA is linked to ER APP ATC 133

Supporting material(s) : EUROCONTROL - SPEC 126 - EUROCONTROL Specification for Minimum Safe Altitude Warning - Edition 0.9 / 19-09- 2009

Url : http://www.eurocontrol.int/safety-nets/public/standard_page/msaw_01.html

Finalisation criteria : 1 - Ground systems upgraded to support the MSAW function.

2 - The technical file (TF) with evidences of compliance and the EC declaration of verification of systems (DoV) has been delivered to the competent National Supervisory Authority (NSA).

3 - MSAW function for operational use.

ATC02.6-ASP02 Align ATCO training with the use of MSAW ground-based safety tools Start:01/2009 Finish:12/2016

Action by : ANS Providers

Description & purpose : Train operational staff in the use of MSAW. The tasks to be done are as follows: - Develop a training package (material);

- Update the training plans;

- Determine staff population to be trained; - Apply the training plans.

Supporting material(s) : EUROCONTROL - SPEC 126 - EUROCONTROL Specification for Minimum Safe Altitude Warning - Edition 0.9 / 19-09- 2009

Url : http://www.eurocontrol.int/safety-nets/public/standard_page/msaw_01.html

Finalisation criteria : 1 - The training plans have been updated and a training package has been developed by the ANSP for the use of MSAW functions.

SESAR Active ECAC

ATC02.7

Implement ground based safety nets - Approach Path Monitor - level 2

REG ASP MIL APO USE INT IND

ESSIP Plan Edition 2012

Description & purpose

Implement and make operational use of the Approach Path Monitor (APM) ground based safety net.

An approach path monitor (APM) is a ground based Safety Net intended to warn the controller about increased risk of controlled flight into terrain accidents by generating, in a timely manner, an alert of aircraft proximity to terrain or obstacles during final approach.

Terrain and traffic characteristics can lead to a significant safety risk that can be mitigated by this tool.

Note:1) Military ATC units are invited to consider implementation of APM level 2 when providing ATS surveillance services to GAT (2) Existing draft EUROCONTROL Specification for APM could be used as guidance material (ref. supporting material of individual SLoAs)

Applicable area(s) Operational capability dates FOR THIS OBJECTIVE

All ECAC States

Selected portions of airspace in which ATS surveillance services are provided. Deployment according to local needs (e.g.: terrain and traffic characteristics as identified by concerned stakeholders)

Initial operational capability: 01/2009

Full operational capability: 12/2016

References

European ATM Master Plan relationship

OI step - [CM-0801]-Ground Based Safety Nets (TMA, En Route)

Applicable legislation

Council Decision of 30 March 2009 endorsing the European Air traffic Management Master Plan of the Single European Sky ATM Research (SESAR) project (2009/320/EC)

Applicable ICAO Annexes and other references

None

Stakeholder Lines of Action (SloA )

SloA ref. Title Start Finish

ATC02.7-REG01 Approve EUROCONTROL Specification for APM DELETED ATC02.7-ASP01 Implement the APM function 01/2009 12/2016

ATC02.7-ASP02 Align ATCO training with the use of APM ground-based safety tools 01/2009 12/2016

ATC02.7-INT01 Amend ICAO documentation if required DELETED ATC02.7-AGY01 Produce EUROCONTROL Specification for APM and related guidance

material

DELETED ▲ Applicable to the military.

Description of finalised SLoAs is available on the EIPR website at http://www.eurocontrol.int/articles/essip-plan/

Consultation & Approval

Working arrangement in charge: SAFETY / SPIN SG

Outline description approved in: 03/2012

Latest objective review at expert level in: 04/2012

Commitment decision body: Provisional Council (PC)

Objective approved/endorsed in: 07/2006

Latest change to objective approved/endorsed in: 05/2012

Expected performance benefits

Safety : The systematic presentation of deviations from the glide path to controllers, as provided by APM, is a major safety

contribution.

Capacity : N/A

Cost-effectiveness : Standardisation of APM enables cost-effective use of resources and is in particular a critical success factor for smaller

ANSP.

Environment : N/A

Security : N/A

ATC02.7

Implement ground based safety nets - Approach Path Monitor - level 2

ESSIP Plan Edition 2012

Detailed SloA descriptions

ATC02.7-ASP01 Implement the APM function Start:01/2009 Finish:12/2016

Action by : ANS Providers

Description & purpose : Put into service ground-based safety tool systems supporting the APM function

Notes : this SLoA is linked to ER APP ATC 133

Supporting material(s) : EUROCONTROL - SPEC 128 - EUROCONTROL Specification for Approach Path Monitor - Edition 0.9 / 19-05-2009

Url : http://www.eurocontrol.int/safety-nets/public/standard_page/apm_01.html

Finalisation criteria : APM is implemented, documented and in operational use. 1 - Ground systems upgraded to support the APM function.

2 - The technical file (TF) with evidences of compliance and the EC declaration of verification of systems (DoV) has been delivered to the competent National Supervisory Authority (NSA).

3 - APM function in operational use.

ATC02.7-ASP02 Align ATCO training with the use of APM ground-based safety tools Start:01/2009 Finish:12/2016

Action by : ANS Providers

Description & purpose : Train operational staff in the use of APM. The tasks to be done are as follows: - Develop a training package (material);

- Update the training plans;

- Determine staff population to be trained; - Apply the training plans.

Supporting material(s) : EUROCONTROL - SPEC 128 - EUROCONTROL Specification for Approach Path Monitor - Edition 0.9 / 19-05-2009

Url : http://www.eurocontrol.int/safety-nets/public/standard_page/apm_01.html

Finalisation criteria : 1 - The training plans have been updated and a training package has been developed by the ANSP for the use of APM functions.

SESAR Active ECAC

ATC07.1

Implement arrival management tools

REG ASP MIL APO USE INT IND

ESSIP Plan Edition 2012

Description & purpose

Implement Basic Arrival Manager (AMAN) tools to improve sequencing and metering of arrival aircraft in selected TMAs and airports.

Applicable area(s) Operational capability dates FOR THIS OBJECTIVE

Initial operational capability: 01/2007 All ECAC States

Selected airports and TMAs in the states. Full operational capability: 12/2015

References

European ATM Master Plan relationship

OI step - [TS-0102]-Basic Arrival Management Supporting TMA Improvements (incl. CDA, P- RNAV)

Applicable legislation

Council Decision of 30 March 2009 endorsing the European Air traffic Management Master Plan of the Single European Sky ATM Research (SESAR) project (2009/320/EC)

None

Applicable ICAO Annexes and other references

None

Stakeholder Lines of Action (SloA )

SloA ref. Title Start Finish

ATC07.1-ASP01 Implement initial basic arrival management tools 12/1998 12/2015

ATC07.1-ASP02 Implement initial basic AMAN procedures 01/2005 12/2015

ATC07.1-ASP03 Adapt TMA organisation to accommodate use of basic AMAN 01/2005 12/2015

ATC07.1-ASP04 Implement basic AMAN functions 01/2007 12/2015

▲ Applicable to the military.

Description of finalised SLoAs is available on the EIPR website at http://www.eurocontrol.int/articles/essip-plan/

Consultation & Approval

Working arrangement in charge: Unassigned

Outline description approved in: -

Latest objective review at expert level in: 04/2012

Commitment decision body: Provisional Council (PC)

Objective approved/endorsed in: 07/2000

Latest change to objective approved/endorsed in: 07/2012

Expected performance benefits

Safety : Maintained or improved.

Capacity : Improved airport/TMA capacity.

Cost-effectiveness : Reduced costs through reduction in delays.

Environment : Reduced holding and low level vectoring has a positive environmental effect in terms of noise and fuel usage.

Security : N/A

Detailed SloA descriptions

In document Temple of the Black Light Espanol (página 69-75)