On July 7th 2009, the Procuraduría General de la Nación60, a state entity in charge of supervising public
employees and representing individuals against the state, ran an auction to provide help desk services, technical support and full maintenance of physical assets and software systems belonging to it in Bogotá and around the country. This is one of the many tenders this institution holds, but we include it in this survey as it was advertised as an auction.
This contract was using an electronic descending auction, similar to a …rst price sealed-bid descending auction. This kind of auction is often held by this entity when it requires di¤erent services to avoid problems of hiring.
The budget available for this was COP $1,000 million. To participate, the auction bidders had to ful…ll all the legal and technical conditions stated in the contract speci…cations. They had to deliver 2 closed envelopes, one containing the information enabling requirements for accreditation, such as legal and …nancial capacity, technical capability and experience in this …eld. The other envelope had to contain an initial bid. The lowest of the economical bids made by the quali…ed participants was the starting bid for the auction.
After being accepted as participants, their bid made could not surpass the budget imposed by the auctioneer, or the starting bid contained in the second envelope opened only one hour previous to the start of the auction. Moreover, the bid had to be made for the totality of the service. None of the participants could identify the others and could only see the position of their bid with respect to the others, but not actual bids (i.e. reserve price).
The auction had a maximum duration of 30 minutes stipulated by the regulations. During this time any participant could make any number of bids, subject to the new bid being at least 0.5% lower than the previous bid. A rule stated that if the best bid was made during the last 5 minutes of the auction, an additional 5 minutes were added. And so on if there was a better bid. If the lowest bid (best bid) seemed arti…cial to the auctioneer, then he would ask for explanations, if not satis…ed with the explanation, the bid would be rejected and the next best bid accepted.
5.3.2 Results
For the quali…cation of the auction there were 2 candidates SELCOMP INGENIERIA LTDA and COMPU- TEL SYSTEM LTDA. But the second did not pass the technical and experience approval required by the
auctioneer. The only participant in the auction was SELCOMP INGENIERIA LTDA. The economic bid envelope was opened and the bid was COP $1000 million, exactly the budget available. As the bid full…led the rules, that was the …nal price, and SELCOMP INGENIERIA LTDA was the winner61.
5.3.3 Conclusions
The results show the lack of competitiveness in this type of auction due to high technical and experience requirements which makes it hard for new entrants to participate or to pass the prequali…cation process.
The adjudication price was exactly the budget available to provide the service of the help desk, technical support and full maintenance of physical assets and software systems of its possession in Bogotá and around the country; the initial economic bid should have been lower than the adjudication price, at least by some stated percentage, then not all the budget would have had to be spent for the auction to make sense. However, the auction did not have any incentives for the participants to place a lower initial economic bid, even if there was more than one participant.
However, the importance in this type of auction, is e¢ciency and for the winner to satisfy the technical requirements. In terms of e¢ciency one cannot tell what the winner of the auction was the one that valued the price the most. Literature in auction e¢ciency shows that many issues concerning asymmetric bidders (when their valuations come from di¤erent distribution functions) could avoid accomplishing e¢ciency in this type of auction (Krishna, 2009).
Although the goals of the technical requirements and the problem of contract hiring were solved, it would have been better if this entity had saved some budget by making the auction more revenue optimal, allowing more entrants the possibility to participate.
Bidders’ entry is always an important concern (Klemperer, 2002). Incentives must be established to accomplish this goal. For instance, political requirements always promote entry deterrence because legal issues can be time consuming. One way to avoid this is to reduce or eliminate legal requirements for entry. Another important concern to attract bidders’ entry, is the mechanism design, this is the most important one because literature on this topic has shown that entry deterrence can be a concern when the auction mechanism chosen promotes predatory behavior. For instance, an auction design where an industrial organization seems to be oligopolistic, requires a design that enables new participants to promote competitiveness instead of scaring them out due to the market power. These kinds of loopholes could be either promoted or corrected by auctions.