• No se han encontrado resultados

Currículum

8. Introducción al currículum

8.4. Niveles de diseño y desarrollo curricular

16.1

The Consumer connected to the DSO distribution network has the freedom to change

the gas fuel vendor.

16.2

The Consumer is not liable to pay any fees to the DSO resulting from the procedure of

changing the vendor. The procedure of changing the vendor lasts not more than 21 days

from the date of filing the application on changing the vendor, i.e. SDO by the Consumer

or the Consumer-authorized vendor to the DSO.

16.3

The originator of the vendor change procedure is the Consumer or the Consumer’s

entitled new Vendor.

16.4

The Consumer makes a choice of new vendor and signs a composite contract or the gas

Grid Code of the EWE energia sp. z o.o. Approved with the Board’s decision of ...

p. 42

16.5

The Consumer or the new vendor acting on behalf of the Consumer cancels the gas fuel

sales contract with the existing vendor. The Consumer or the new vendor informs the

existing vendor and the DSO on the date of starting the sale of gas fuel by the new

vendor to the Consumer. DSO is informed by filing the SDO, specimen of which is

available on the DSO web page.

16.6

The contract, based on which the energy enterprise provides the gas fuel to the

Consumer of this fuel in the household is subject to be cancelled with the last day of the

month following the month in which the application of this Consumer reached the

energy enterprise. The Consumer may specify a later date of cancelling the contract.

16.7

The start of distribution services to the Consumer or the new vendor (based on the new

SDO) takes place with the beginning of the new gas day following the gas day in which

the sales contract was cancelled with the existing vendor.

16.8

The procedure of vendor change takes place after filing the SDO, so accordingly to that,

the new vendor or Consumer who took over the responsibilities for transporting the gas

fuel from the DSO network exit point shall enter the distribution contract with the given

DSO and shall have the DSC status. Distribution contract with the given DSO shall be

concluded before or simultaneously with filing the SDO.

16.9

In case when the vendor change comes in relation to concluding the complete

agreement, the new vendor is obliged to file the SDO, based on which the gas fuel

distribution agreement will be performed up to the exit point from which the gas fuel is

being collected by the Consumer performing the vendor change. New vendor is obliged

to file the SDO latest 21 prior to the date of selling the gas fuel to the Consumer. SDO

shall be notified that the Consumer provided efficient cancellation of the gas fuel sales

contract with the existing vendor on the date of starting the sale by the new vendor.

The provisions of point 14 are applied accordingly. The provisions of point 13.3.3.4 in

relation to the exit point throughput are not applicable.

16.10

In case when the vendor change comes in relation to concluding the gas fuel sales

contract, the Consumer is obliged to file the SDO, based on which the gas fuel

distribution agreement will be performed up to the exit point from which the gas fuel is

being collected by the Consumer performing the vendor change. The Consumer is

appointed with the DSC status. The Consumer is obliged to file the SDO latest 21 prior to

the date of purchasing the gas fuel. SDO shall be notified that the Consumer provided

efficient cancellation of the gas fuel sales contract with the existing vendor on the date

of starting the sale by the new vendor. The provisions of point 14 are applied

accordingly. The provisions of point 13.3.3.4 in relation to the exit point throughput are

not applicable.

16.11

SDO, described in point 16.9 and 16.10 in specific, shall additionally include:

16.11.1DSC data,

16.11.2date, when the gas fuel sale shall start by the new vendor and start of the distribution service based on the new SDO, whereas the date cannot fall earlier than:

Grid Code of the EWE energia sp. z o.o. Approved with the Board’s decision of ...

p. 43 16.11.2.1 21 days after filing the SDO,

16.11.2.2 before cancelling the contract with the existing vendor,

16.11.2.3 DSO’s allocated original number of the measurement system, installed in the exit point and the specific address of the gas fuel collection point.

16.12

The SDO, which is described in point 16.9 and 16.10 respectively is investigated

according to the provisions of point 14, with the provision that the dates which are

described in points 14.3.4 and point 14.3.7 amount to 7 days.

16.13

In the period of 7 days from the date of submitting the compete SDO, which is described

in the point 16.9 and 16.10, DSO informs the new vendor on the date of starting the

fulfilment of the SDO and the existing vendor on the date of finishing the fulfilment of

the SDO.

16.14

With the date of starting selling the gas fuel by the new vendor, the ordered contractual

power for the WR exit points and the tariff rate, according to which the DSO will bill the

distribution service for WR and WS exit points for the needs of the new DSC do not

change. The change of the amount of contractual power as well as the tariff group is

made according to the rules included in the tariff, including the history of changing

these parameters in the given exit point.

16.15

At the day of starting the provision of the distribution service based on the SDO of the

new vendor or the new Consumer, the throughput of the exit point used by the existing

vendor accrues to a new vendor or to a new Consumer (DSC) accordingly.

16.16

In case when in the process of SDO verification, which is described respectively in points

16.9 and 16.10, the DSO concludes that the new vendor does not fulfil the requirements

of providing the distribution service and the Consumer has already cancelled the

complete contract with the existing vendor and there is no possibility for providing the

gas fuel deliveries from other vendors, the obligations in the scope of gas fuel sales

against the Consumer are taken over by ex officio vendor. DSO informs the Consumer

on taking over the obligations against this Consumer by the ex officio vendor, unless the

Consumer chose another vendor.

16.17

In order to perform settlements of the existing vendor with the Consumer in the scope

of vendor change procedure, the DSO performs the readout of measurement system.

16.18

The readout which is mentioned in point 16.17 is performed by the DSO in the last day

of validity of the existing vendor’s SDO. In case there is no possibility to perform the

readout, the DSO performs the estimation of the collected gas fuel.

16.19

Data necessary for the settlements which are mentioned in point 16.17 are provided by

the DSO to the existing and the new vendor in the period of 5 working days from the

date of making the readout or estimation.

Grid Code of the EWE energia sp. z o.o. Approved with the Board’s decision of ...

p. 44

ODBIORCA CONSUMER

NOWY SPRZEDAWCA NEW VENDOR

DSO DSO

DOTYCHCZASOWY SPRZEDAWCA EXISTING VENDOR

1. ZAWARCIE NOWEJ UMOWY 1. ENTERING INTO AGREEMENT 2. INFORMACJA O DNIU ROZPOCZĘCIA NOWEJ I

WYPOWIEDZENIE DOTYCHCZASOWEJ UMOWY SPRZEDAŻY

2. INFORMATION ON THE DAY OF STARTING THE NEW SALES CONTRACT AND THE TERMINATION OF THE EXISTING CONTRACT

2a. UPOWAŻNIENIE PRZEZ ODBIORCĘ 2a. AUTHORIZATION BY THE CONSUMER 3a. ZŁOŻENIE PZD ZMIANY SPRZEDAWCY 3a. SUBMISSION OF VENDOR CHANGE TO SDO

4a. PRZEKAZANIE INFORMACJI O TERMINIE ROZPOCZĘCIA

REALIZACJI PZD

4a. PROVISION OF THE INFORMATION ON THE DATE OF

STARTING THE SDO FULFILMENT 4b. PRZEKAZANIE INFORMACJI O TERMINIE ZAKOŃCZENIA

DOTYCHCZASOWEGO PZD

4b. PROVISION OF THE INFORMATION ON THE DATE OF

FINISHING THE EXISTING SDO

Do 7 dni Up to 7 days

Minimum 21 dni Minimum 21 days OSTATNI DZIEŃ OBOWIĄZYWANIA UMOWY Z

DOTYCHCZASOWYM SPRZEDAWCĄ

LAST DAY OF THE CONTRACT WITH THE EXISTING VENDOR PIERWSZY DZIEŃ OBOWIĄZYWANIA UMOWY Z NOWYM

SPRZEDAWCĄ

FIRST DAY OF THE CONTRACT WITH THE NEW VENDOR 5. Odczyt (do 5 dni roboczych) 5. Readout (up to 5 working days)

6a. PRZEKAZANIE DANYCH DO ROZLICZENIA 6a. PROVISION OF DATA FOR SETTLEMENT