• No se han encontrado resultados

No estás perdiendo nada al dejar de beber

In document La Estafa del Alcohol (página 54-58)

This is used for valuation of inventories like work in process & finished goods. - Data is flow from MM, PP, FI&CO modules - Product costing made easy- sap labs

- When we will take production – It will be standard cost - In the month ending we will knows the actual cost - The differences will be settle variances of accounts

Data flow in product costing: Example: Product AMLFG1

Cost sheet AML finished goods

Raw material XXX (Qty from BOM * Rate from material master Raw material overheads XXX (10% of raw material)

Production cost XXX (hours required * machine hour rate) ---

Cost of goods manufacturing XXX (COGM)

Admn& selling& dist exp XXX ---

Sales budget  Production budget

Sales budget: Make to order

Make to stock

Production budget: Material requirement plan

Overheads planning

MM

Material master Accounting view

Raw material (AMLRM1) – Moving average price – 75/- (AMLRM2) – Moving average price – 100/-

PP: Bill of material (BOM) required for production

AMLRM1 – 1kg AMLRM2 – 1kg

Dept A Dept B Dept C Dept D  Work centre in PP

 X   (Finished goods (AMLFG)

Finished product (AMLFG) process flow A  C  D (Routing) Salaries – 200000 Wages - 500000 Rent - 20000 --- 720000 Machines – 100 Machines

Machine hours = 100 * 24 hours * 30 days = 72000 machine hours Machine hour rate = 720000/72000 = 10/- per hour

Creation of secondary cost elements:

1. Overhead cost element 2. Activity cost element

Use the transaction code: KA06

Use the cost element: 1100000

Valid from: 01.04.2006 to 31.12.9999 Enter

Give the name: RM overhead rate Description: RM overhead rate

Cost element category: select 41 (Overhead rate) Save

One more cost element: 1200000 Valid from: 01.04.2006 to 31.12.9999 Enter

Give the name: Activity cost element Description: Activity cost element

Cost element category: select 43 (Internal activity allocation) Save

Creation o f activity type: (Called machine hour)

Accounting  controlling  cost centre accounting  master data  activity type  individual processing  create (KL01)

Activity type: AML

Name: Machine hour Description: Machine hour Activity unit: Select H (Hour)

Cost centre categories: Select * (All cost centre categories) Enter

Activity type category: select 1 (Manual entry, manual allocation) Allocation cost element: select 1200000

Save

Creation of 2 cost centers: (KS01)

Give the cost centre: Dept G

Valid from: 01.04.2006 to 31.12.9999 Reference cost centre: Dept A

Controlling area: AML Enter

Change the name to dept G Description: Cost centre dept G Other fields are common Save (or) (ctrl + s)

One more cost centre: Dept H

Valid from: 01.04.2006 to 31.12.9999 Reference cost centre: Dept A

Enter

Change the name to dept H Cost centre: Dept H

Cost centre category: Select 9 (Allocation cost centre) Save

Creation of cost centre group: (KSH1)

Give the cost centre group: AML Prod Enter

Give the cost centre group: AML prod Select insert cost centre button

Give the cost centre: Dept G Select save button (or) (ctrl + s)

Define overhead keys:

SPRO  Controlling  product cost controlling  basic settings for material costing  overhead  define overhead keys

Select new entries button Overhead key name: AML Description: AML Overhead key Save

Save in your request

Define overhead group:

Same path

Select new entries button Valuation area: AMLP Overhead group: AML Overhead key: AML

Name of overhead group: Overhead group for AML Save

Save in your request

Define calculation bases:

SPRO  controlling  product cost controlling  product cost planning  basic settings for material costing  overhead  costing sheet components  define calculation bases

Select new entries button Base: A1

Name: Raw materials Save, Save in your request Select: A1

Double click on details folder Give the controlling area: AML Enter

Select new entries button

From cost element: 400000 to 400099 Save

Select back arrow 3 times Select: New entries button Base: A2

Name: Production cost, Save

Select: A2

Double click on details folder Give the controlling area: AML Enter

Select new entries button

From cost element: 400100 to 400299 : 400500

: 1200000 Save (or) (Ctrl + s)

Define percentage overhead rates: Path: same path

Select: new entries button Overhead rate: A3

Name: Raw material overhead rate

Dependency: Select DO10 (Overhead type/H key) Save

Save in your request Select: A3

Double click on details folder Ignore the message, press enter Select new entries button

Overhead type: Select 2 (Planned overhead rate) Overhead key: AML

Percentage: 15%

One more:

Valid from: 01.04.2006 to 31.03.2007 Controlling area: AML

Overhead type: Select 1 (Actual overhead rate) Overhead key: AML

Percentage: 10% Save

Save in your request

Define credits:

Same path

Select new entries button Give the credit key: A4

Name: Raw Material credit key Save

Save in your request Select: A4

Double click on details folder Give the controlling area: AML Enter

Select new entries button Valid to: 31.03.2007

Fixed percentage: 100% Cost centre: Dept H Save

Example:

RM1 – Handling charges Dr - Dept H – 3000

To Bank 3000

RM2 – Handling charges Dr – Dept H – 7000

To Bank 7000 Dept H Handling 10000 | 3000 Charges | 7000 (7000 + 3000) | --- 10000 Production 1 production2 RM cost 30000 RM Cost 70000 10% of cost 3000 10% of cost 7000

Define costing sheet:

SPRO  Controlling  product cost controlling  basic settings for material costing  overhead  define costing sheets

Select new entries button Costing sheet: AML

Description: AML costing sheet Select: AML

Double click on costing sheet rows folder Select new entries button

Give Row: 10, Basic: A1 (Raw materials)

Row: 20, overhead rate: A3 (Raw material overhead rate) From: 10 to Row 10: Credit: A4

Row: 30, Base: A2 (Production cost)

Row: 40, Description: Cost of goods manufacture From Row 10 to Row 30

SPRO  controlling  Product cost controlling  product cost planning  material cost estimate with quantity structure  define costing variants

Transaction code: OKKN

Select costing variant: PPL1 (Standard cost estimate (Material)) Select details button

Select valuation variant button

Select create button (Beside valuation variant/plant) Select new entries button

Give the plant: AMLP Save, Save in your request Select back arrow

Select valuation variant: 001 with plant: AMLP Select details button

Select overhead tab

Give the costing sheet: AML – costing sheet The costing sheet: AML – costing sheet Save

Define cost component structure:

SPRO  controlling  product cost controlling  product cost planning  basic settings for material costing  define cost component structure

Select structure: 01

Double click on: Cost components with attributes folder Select: cost component 10 (Raw materials)

Double click on assignment cost components – cost element interval folder Select new entries button

Cost component structure: 01 Chart of accounts: AML

From cost element: 400000 to 400099 Cost element: 010 (Raw materials)

Save, ignore the warning message, and enter Save in your request

Double click on cost components with attributes folder Select component: 80 (Material overhead)

Double click on assignment cost component – cost element interval Select: new entries button

Cost component structure: 01 Chart of accounts: AML

From cost element: 1100000 (Overhead rate) Cost component: 080 (Material overhead) Save

Double click on cost elements with attributes folder Select cost component: 50 (Production machine)

Double click on assignment cost component – cost element interval folder Select new entries button

Cost component structure: 01 Chart of accounts: AML

One more

Cost component structure: 01 Chart of accounts: AML From cost element: 400500 Cost element structure: 050 Cost component structure: 01 Chart of accounts: AML From cost element: 1200000 Cost element structure: 050

Save

Double click on cost element structure folder For ‘0’ select activate check box

Save (or) (ctrl + s)

Determine person responsible for work centre:

Path: SPRO  production  Basic data  work centre  general data  determine

person responsible Select new entries button Give the plant: AMLP Person responsible: A Give the responsible: Mr. A Save

Save in your request

Define MRP controller: (MRP: Material requirement planning)

SPRO  production  material requirements planning  master data  define MRP controllers

Select new entries button Give the plant name: AMLP MRP controller: B

Description: Mr. B Save

Save in your request

Define floats (Scheduling margin key) (Floats: Cushion period)

Path: SPRO  production  materials requirement planning  planning  scheduling

& capacity parameters  define floats (Schedule margin key) Select new entries button

Give the plant name: AMLP Schedule margin key: AML Opening period: 2 days

Float before production: 2 days Float after production: 2 days Release period: 2 days

Save

Save in your request

Define production scheduler:

SPRO  production  shop floor control  master data  define production scheduler Select new entries button

Plant: AMLP

Production scheduler: C

Production scheduler name: Mr. C Save (or) (ctrl + s)

Version: 0

From period: 9 to 9 Fiscal year: 2006 Cost centre: Dept G Next page

Cost centre: 400100 (Salaries) Select form based radio button Select over view screen button Give plan fixed cost: 720000 Save

Planning for machine hours:

Accounting  controlling  cost centre accounting  planning  activity ad put/prices  change (KP26)

Version: 0

From period: 9 to period: 9 Year: 2006

Cost centre: Dept G Activity type: AML

Select form based radio button Select overview screen button

Give plan activity 72000 (100 machines * 3 shifts * 30 days) Save

Machine down rate calculation:

Accounting  controlling  cost centre accounting  planning  allocations  price calculation (KSPI)

Select cost centre group radio button Give the cost centre: AMLPRODN Version: 0

From period: 9 to period: 9 Fiscal year: 2006

Execute

Select save button (or) (ctrl + s) Ignore the message, press enter

Creation of material master: (MM01)

Give the material number: AMLRM2 Industry sector: Mechanical engineering Material type: Raw material

Press: select use button

Select: Basic data, purchasing, general plant data/storage one, accounting Select organization levels button

Give the plant: AML Storage location: Hyd Enter

Give the description: Raw material Basic unit of measurement: Kg Material group: Chem

Purchasing group: AML Select: Accounting1 tab Valuation class: AML1 Price control: V

Moving price: 100 Save

Creation of finished goods master (MM01):

Material No: AMLFG1

Industrial sector: Mechanical engineering Material type: Finished product

Press select views button

Select: Basic data1, MRP1, MRP2, work scheduling, general plant data/storage1, Accounting1, costing1.

Select organization levels button Plant: AMLP

Storage location: Hyd Enter

Give the description: Finished product1 Basic unit of measurement: Kg

MRP type: select PD (MRP) MRP controller: Select B (Mr. B)

Lot size: select Ex (Lot for lot order quantity) Select MRP2 Tab

In house production: 0 days Schedule margin key: AML Select work schedule time tab Ignore the warning message, enter Production: Scheduler C

Select accounting1 tab Valuation class: AML2 Price control: S (Standard) Give the standard price: 300/- Select costing1 tab

Overhead group: Select AML

Availability check: Select KP (No check) Save

Creation of Bill of material:

Logistics  production  master data  bills of material  bill of material  material BOM  Create (CS01)

Give the material No: AMLFG1 Plant: AMLP

Give the component

For item 10: AMLRM1; Qty: 1 Kg Item 20: AMLRM2; Qty: 1 Save

Creation of work centre:

Logistics  production  master data  work centers  work centre  create (CR01) Work centre: Dept G

Work centre category: select 0001 (Machine) Select basic data button

Give the description: Work centre Dept G Person responsible: A

Usage, select 009 (All task lists types)

Standard value key: SAP1 (Normal production) Select costing tab

Start date: 01.04.2006 Cost centre: Dept G

For activity machine: Give the activity type AML Performance unit: H (Hour)

Formula key: SAP002 (Production machine types) Save

Creation of routing:

Logistics  Production  master data  routings  routings  standard routings  create (CA01)

Give the material No: AMLFG1 Plant: AMLP

Enter

Usage: select1 (Production)

Status: Select 4 (Release (General)) Select operation button

For operation at tab give the work centre: Dept G Control key: Select PP01 (In house production) Select operation: 10 and double click

Machine: standard values: 5 Unit: H (hours)

Save

Creation of cost estimate with quality structure:

Accounting  controlling  product cost controlling  product cost planning  material costing  cost estimate with quantity structure  create (T. Code: CK11N) Give the material: AMLFG

Plant: AMLP

Costing variant: PPC1 (Standard cost estimate) Enter

Give the costing date from: 08.12.2006 Costing date to 31.12.9999 Qty structure date: 08.12.2006

Valuation date: 08.12.2006 Enter

Standard cost should be: 251.25 Cost sheet

--- 175.00 RM overhead 15% 26.25 Production costs (5*10) machine hours 50.00 --- 251.25

From the menu select: Cost  Display cost components Select save button (or) (ctrl + s)

Enter

In document La Estafa del Alcohol (página 54-58)