• No se han encontrado resultados

Observar todo “Una gran parte del Arte es, yo creo, ser capaz de observar dejarle nada al azar, no dejes nada sin ver: combina las observaciones contradictorias y date

Surgimiento de las escuelas de medicina y origen de

1. Observar todo “Una gran parte del Arte es, yo creo, ser capaz de observar dejarle nada al azar, no dejes nada sin ver: combina las observaciones contradictorias y date

Transit

Leverage and implement the most current ITS technologies to improve travel time reliability of roadways and transit. In 2010 the MassDOT Highway Division completed a strategic plan that was intended to help that division achieve four goals:

Improve incident management

Improve congestion management

Improve safety and security management

 Improve operations and maintenance cost effectiveness

This objective will help implement those strategies for the highway division and across the entire transportation network. Travel time reliability is one cross-cutting area that can benefit from joint coordination and implementation.

2. Develop a seasonal and special events ITS deployment strategy and procedure.

3. Develop a traffic operations data warehouse with a visual component to compile and display congestion data.

Implementation Table

Project title: Work Zone ITS Deployment Strategy and Standard Procedures Timeframe: Short-term

Project Cost: $80,000

Project Description: Establish guidelines for work zone and operations personnel to

equip roadway work zones with effective ITS technologies as management tools. Guidelines will include requirements for roadway contractors to purchase and/or equip their work zones with interoperable ITS solutions to enable management and situational awareness of the zone.

Project Lead: MassDOT – Highway Division – ITS Programs

Key stakeholders: FHWA, MassDOT – ITS Planning, MassDOT – Highway Division –

Traffic Engineering, MassPort, MSP

Project Strategy Prerequisites:

 3.2.1 Design, Construction, and Communication Standards for ITS

Objectives

 Enhance the safety of work zone personnel

 Improve traffic flow through work zones using ITS and operations tools

Inputs

 Existing work zone policies and practices

 Best practices in work zone ITS

 Existing work zone specifications and standards

 Interviews with work zone personnel

 Existing roles, responsibilities and jurisdictions of key stakeholders

 Existing policies and agreements between stakeholder agencies

Outputs and Deliverables  Collaboration MOUs

 Amended MassDOT Policies

 Work zone ITS specifications

Implementation Table

Project title: Seasonal and Special Event

ITS Strategy Timeframe: Short-term Project Cost Planning: Infrastructure: TBD

Project Description: Strategize and deploy ITS solutions to roadways to address

seasonal, weather related concerns at critical areas, and, where appropriate, at critical seasonal-related multi-modal junctions. Also deploy roadway and transit ITS solutions to facilitate and manage travelers to and from special significant events. Results will include permanent and temporary ITS solutions, and relevant changes to existing SOPs for the management of seasonal and special events.

Project Lead: MassDOT – Highway Division – HOC

Key stakeholders: FHWA, MassDOT – Highways Division – ITS Programs, MassDOT –

ITS Planning, MassPort, MBTA, MPOs, MSP

Project Strategy Prerequisites:

 1.1.1 Statewide ITS Planning Guidebook

 1.2.2 Standardized ITS Project Execution Process

 1.2.3 Centralized ITS Planning and Approval Process

 1.3.1 Standardized ITS Project Concept of Operations

 1.3.2 Standardized ITS Funding and Planning Processes

 3.2.1 Design, Construction, and Communication Standards for ITS

 3.3.1 ITS Design Checklist

 3.3.2 ITS Lifecycle Cost Template

 3.3.3 ITS Operational Cost Planning and Procurement

 3.4.2 Performance Monitoring Requirements

Objectives

 Enhance the safety of areas within the transportation network that experience seasonal issues

 Improve traffic flow during special events

Inputs

 Existing special events and seasonal policies and practices

 Best practices in special event and seasonal ITS

 Existing roles, responsibilities and jurisdictions of key stakeholders

 Existing policies and agreements between stakeholder agencies

Outputs and Deliverables

 Collaboration MOUs with special event stakeholders

 Policies and procedures for addressing seasonal operations

Implementation Table

Project title: Traffic Operations Data

Warehouse

Timeframe: Short-term Project Cost: $1,500,000

Project Description: Consolidated data warehouse to house all existing and future

roadway and transit ITS data in a single location. The data will be used to display roadway congestion information and related transit operational information. The data warehouse will interface with all relevant collaborative operational platforms.

Project Lead: MassDOT IT

Key stakeholders: MassDOT – ITS Planning , MassDOT – Highway Division – ITS

Programs, MPOs, Municipalities, MSP, Other Participating Organizations, MassDOT – Highway Division – HOC

Project Strategy Prerequisites:

 1.1.1 Statewide ITS Planning Guidebook

 1.2.2 Standardized ITS Project Execution Process

 1.2.3 Centralized ITS Planning and Approval Process

 1.3.1 Standardized ITS Project Concept of Operations

 1.3.2 Standardized ITS Funding and Planning Processes

 3.2.1 Design, Construction, and Communication Standards for ITS

 3.3.1 ITS Design Checklist

 3.3.2 ITS Lifecycle Cost Template

 3.3.3 ITS Operational Cost Planning and Procurement

 3.4.2 Performance Monitoring Requirements

Objectives

 Implement standardized clearinghouse for transportation data

 Enable the capability to quantify and assess congestion throughout the Commonwealth

Inputs

 Existing data sources and formats

 Existing IT policies

 Existing IT network infrastructure

Outputs and Deliverables

 Collaboration MOUs with data resource partners

 Data warehouse

 Recommendations for expanded field ITS technologies to support data collection

Implementation Table

Project title: Congestion Performance

Monitoring, Reporting, and Improvement

Timeframe: Short-term Project Cost: $150,000

Project Description: Periodic published report to display the health and effectiveness of

the existing transportation network, including multimodal aspects, through the display of performance measures, operational information and system health measures for highways and transit. The report will incorporate existing and future data available for the networks, and will include high level recommendations for network improvements.

Project Lead: MassDOT Office of Performance Management & Innovation

Key stakeholders: FHWA, MassDOT Divisions, MPOs, MassDOT – ITS Planning,

MassDOT – Highway Division – HOC

Project Strategy Prerequisites:

 3.4.3 Performance Monitoring Working Group

 3.2.1 Design, Construction, and Communication Standards for ITS

Objectives

 Comprehensively monitor the performance of the transportation network

 Establish a culture of continuous improvement of the transportation network

Inputs

 Data from the data warehouse and other sources

 Existing performance objectives

 Desired performance objectives

Outputs and Deliverables

 Regular performance reports

 Identified key corridors

Objective 3.2: Standardize the Technological Environment of