• No se han encontrado resultados

Apéndice 1: Start-ups: The University as promoter, main lines of research

1.3. Perfil del Emprendedor

(a) Maintaining a system of built up drains

(i) A system of drains built with cement or concrete, should have been maintained, so as to cover more than thirty percent (30%) of the total length of roads in urban areas and in areas considered to be built up areas.

(i) On both sides of the remaining roads in the area referred to in (i) above, surface drains should have been made and maintained periodically.

(ii) Debris that get deposited in the drains should have been removed, in respect of all built up drains.

(a.1) Maintaining a system of built up drains – Confirmation of the fact that the requirement has been fulfilled.

(i) If all the above requirements are correctly in place, it should be considered that section 5.2 (a) is completed.

(ii) The fact that, above activities have been performed in that manner has to be ascertained by examining files.

(iii ) If the progress shown is lower than the above positions, it should be considered that this requirement is not completed.

(b) Having a system of drains, which are not constructed as such but maintained satisfactorily.

(i) In areas other than those referred to in (a) above drains should have been cut and maintained on either side of the roads.

(ii) People residing near the roads should have been encouraged to maintain drains on either side of the roads, regularly, and that work should have been fulfilled accordingly.

It is not necessary to investigate this section any further, if there is no proper system of drains in the council area. This position can be observed when entering the council area, for investigation.

(b.1) Having a system of drains which are not constructed as such, but maintained satisfactorily – Confirmation of the fact that the requirement has been fulfilled.

(i) If all the above requirements are correctly in place, it should be considered that section 5.2 (b) is completed.

(ii) The fact that, above activities have been performed in that manner has to be ascertained by examining files.

(iii ) If the progress shown is lower than the above positions, it should be considered that this requirement is not completed.

(c) Maintaining the system of drains, regularly.

(i) Action should have been taken to maintain the system of drains, regularly.

(ii) Owners of relevant lands, should have been directed to construct culverts or to fix concrete slabs, at the entrance to the land from the road across the drain, and to repair and maintain the same regularly.

(iii) When any owner of a land does not act in the manner referred to in (ii) above, action should have been taken to do the needful, under council expenditure and to recover the amount so expended, from the owner of the land.

(c.1) Maintaining the system of drains regularly - Confirmation of the fact that the requirement has been fulfilled.

(i) If all the above requirements are correctly in place, it should be considered that section 5.2 (c) is completed.

(ii) The fact that, above activities have been performed in that manner has to be ascertained by examining files.

(iii ) If the progress shown is lower than the above positions, it should be considered that this requirement is not completed.

(d) Areas prone, to disasters caused by water, have been identified.

(i) Areas which are subject, to floods due to rain water or overflowing of rivers, canals, streams or any other water courses or to disasters, should have been identified and separate records should have been maintained up to date.

(ii) Records should have been maintained separately in respect of areas which can be subject to disasters, in accordance with the time periods when such instances could occur.

(iii) A mechanism to obtain daily rainfall figures of the area, should have been identified and the areas which would be subject to disasters caused by water should have been identified, separately, according to the quantum of rainfall in each of such areas.

(d.1) Areas prone to disasters caused by water have been identified – Confirmation of the fact that the requirement has been fulfilled.

(i) If all the above requirements are correctly in place, it should be considered that section 5.2 (d) is completed.

(ii) The fact that, above activities have been performed in that manner has to be ascertained by examining files.

(iii ) If the progress shown is lower than the above positions, it should be considered that this requirement is not completed.

(e) Drainage plans have been prepared.

(i) Room for stagnation of water flowing along the rain water drains, on any land, should have been removed.

(ii) Action should have been taken to remove debris deposited in every drain, before the rainy season in accordance with reports referred to in (d) above.

(iii) In every instance, of not having an outlet for flowing the water in a drain, action should have been taken to construct water outlet drains across any private land.

(e.1) Drainage plans have been prepared – Confirmation of the fact that the requirement has been fulfilled.

(i) If all the above requirements are correctly in place, it should be considered that section 5.2 (f) is completed.

(ii) The fact that, above activities have been performed in that manner has to be ascertained by examining files.

(iii ) If the progress shown is lower than the above positions, it should be considered that this requirement is not completed.

5.2.1 Rain water drains – Confirmation before awarding of marks.

(i) If all the above requirements are completed section 5.2 can be considered in the position of “very good” (E.M. = 4)

(ii) If requirements in 5.2 (a) to 5.2 (d) are completed, this section can be evaluated as “good” (E.M. = 3).

(iii ) If requirements in 5.2 (a) to 5.2 (c) are completed, this section can be evaluated as “average” (E.M. = 2)

(iv ) If requirements in 5.1. (a) and 5.1 (b) are completed, this section can be evaluated as “weak” (E.M. = 1)

(v) If the above requirements are not completed in that manner, no marks will be awarded (E.M. = 0)