Integrated water resources management at the level of a river basin
Critical multi level governance issues of integrated modelling: An example of low water management in the adour garonne basin (France)
12
Project Title: Baseline Inventory of Priority Wetlands in the Moldovan Part of the Danube River Basin which should be a part of the DRB Management Plan towards Integrated Management of Water Resources in Line with EU WFD
6
Resolution X.19 Wetlands and river basin management: consolidated scientific and technical guidance
57
Ramsar COP10 DR 19 Draft Resolution X.19 Wetlands and river basin management: consolidated scientific and technical guidance
57
Policy Paper circulated during the World Summit on Sustainable Development by The Swiss Agency for the Environment, Forests and Landscape (SAEFL), the Bureau of the Convention on Wetlands (Ramsar, Iran, 1971) and the World Wide Fund for Nature (WWF)
12
Políticas públicas del agua en el Perú: vicisitudes para la creación del consejo de recursos hídricos de la cuenca Ica-Huancavelica.
37
The water footprint of a river basin with a special focus on groundwater: The case of Guadalquivir basin (Spain).
17
Managing water scarcity at a river basin scale with economic instruments
31
Gestión hídrica en el sistema familiar lácteo de la subcuenca Amecameca en el Estado de México.
15
The economic value of drought information for water management under climate change: a case study in the Ebro basin
15
Editorial: Economics at a River Basin Scale
7
WetlanDS taKe CaRe OF WateR
16
A Background Paper Theme 1
15
Impact of population growth of Pereira on water resource in the Cestillal River Basin
6
Public participation and the role of social networks in the implementation of the Water Framework Directive in Spain
21
LINKING POVERTY REDUCTION AND WATER MANAGEMENT
82
CONVENTION ON WETLANDS (Ramsar, Iran, 1971) 37 th Meeting of the Standing Committee
57
New perspectives in the watershed approach for water management
12
Mesoscale eddies in the Western Mediterranean Sea: characterization and understanding from satellite observations and model simulations
273
Combined annual reporting and forward planning format Annual Report for Year 2012 and Plan for Year 2013 (4 pages maximum)
10