Description 1.0 INTRODUCTION
1.1 Project Specific Information 1.2 General Description of the project 1.3 Implementation of the project 2.0 SALIENT FEATURES
3.0 ACCESS TO AND WITHIN THE PROJECT AREA 3.1 Road Access to the Project Area 3.2 Rail Access to the Project Area
4.0 LIMITATION ON LOAD/CONSIGNMENT DIMENSIONS OF CONTRACTOR’S EQUIPMENT, PERMANENT EQUIPMENT ETC. i.e. INFORMATION ABOUT CAPACITY OF BRIDGES ENROUTE TO SITE.
5.0 AVAILABILITY OF LAND FOR CONTRACTOR’S INFRASTRUCTURE AS WELL AS FOR WORKS.
6.0 DETAILS ABOUT IDENTIFIED DUMPING AREA
7.0 DETAILS ABOUT QUARRIES FOR EXTRACTION OF COARSE AND FINE AGGREGATES.
8.0 IDENTIFIED SOURCE OF WATER SUPPLY FOR CONTRACTOR’S USE.
9.0 ARRANGEMENT/AVAILABILITY OF CONSTRUCTION POWER FOR
CONTRACTOR’S USE FOR MAIN WORKS AND THEIR INFRASTRUCTURAL FACILITIES.
10.0 AVAILABLE COMMUNICATION FACILITIES.
11.0 INNER LINE PERMIT/PASS, IF ANY, REQUIRED FOR CONTRACTOR AND HIS WORKMEN.
12.0 AVAILABILITY OF NEAREST FUEL STATION.
13.0 AVAILABLE INFRASTRUCTURAL FACILITIES, IF ANY FOR HANDING OVER TO CONTRACTOR ON ‘AS IS WHERE IS/ BASIS.
14.0 ISSUE OF MATERIALS TO THE CONTRACTOR
15.0 DETAILS ABOUT LOCAL TAXES INCLUDING WORKS CONTRACT TAXES LIVABLE PRESENTLY IN THE STATE OF UTTAR PRADESH.
16.0 ANY OTHER INFORMATION RELEVANT TO BE INCLUDED IN TENDER DOCUMENT FOR SUCCESSFUL COMPLETION OF PROJECT.
Plate-01 Location key Map of Proposed Project Site at Parasan Plate-02 Project Site Map
********
1.0 INTRODUCTION
1.1 Project Specific Information
Bundelkhand Saur Urja Ltd. (BSUL) is a Joint Venture of NHPC Ltd and Uttar Pradesh New & Renewable Energy Development Agency. NHPC being the largest organisation for hydropower development in India, with capabilities to undertake all the activities from conceptualization to commissioning in relation to setting up of hydro projects has planned to setup 30MWp grid interactive Crystalline Solar PV Technology power project at Village-Parasan, Tehsil-Kalpi, District-Jalaun Uttar Pradesh through Bundelkhand Saur Urja Company (a Joint Venture of NHPC Ltd. and Uttar Pradesh New and Renewable Energy Development Agency i.e. UPNEDA). This project will produce the power for more than 25 years. Full power rating of the solar power plant shall be 30 MWp at standard test conditions (STC) of 1000 W/m2 sunlight and 25 oC. The project boundary length shall be approx. 10.9 Km.
The Project shall be implemented through EPC agreement. The unencumbered project land required for the project shall be provided by the owner. The power generated at power plant will be stepped-up and connected to 132 KV grid network. The nearest 132/33 KV S/S (substation) is located at Village- Sarsela, Tehsil-Kalpi, District-Jalaun Uttar Pradesh., which is about 22 km from the project site. The transmission line required from the proposed 30 MWp plant site to the substation will be laid by Employer or some agency hired separately to evacuate the power. The power plant will comprise of Crystalline PV modules with seasonal manual tilt type mounting structures.
The project site at Village Parasan is situated at approx. coordinates 25o56’15”(N) [25.9375] Latitude and 79o41’15”(E) [79.6875] Longitude. The Village Parasan is shown in Survey of India Toposheet No G44N9(54O/9) Jalaun District is a part of Jhansi Division. The districts of Etawah and Kanpur lie to the north across the Yamuna, while Hamirpur District lies to the east and southeast, Jhansi District lies to the southeast, and Bhind District of Madhya Pradesh lies to the west cross the Pahuj. The project is 120 Km approx. by Road from Kanpur (the nearest Airport), 32 Km by road from Kalpi (the nearest Railway Station), 56 Km by road from Orai Railway Station(District head quarters), 186Km by road from Jhansi Railway Station. The Village Parasan is about 2 Km from MDR 19B(Kalpi Dagawa-Rath Marg). Average Elevation near Roads is 135-137m above MSL.
Parasan Village has a B.O. Post Office with Pincode 285202. Nearest banks viz Allahabad UP Gramin Bank –Parasan Branch is situated in Village Parasan with IFSC Code ALLA0AU1022 with regional office at Orai. The popular market nearby are Kalpi, Orai and Kanpur.
The climate of the Project area is of typical Central Indian climate, with mild winters and hot summers. Hot wind flows during May and June locally designated as “Loo”. The temperature during summers goes up to 50°C. The rainy Season is limited to 2½ - 3 months of July to September only. Winter rain fall is rare.
1.2 General Description of the project
Kalpi Solar PV Power plant envisages the utilization of about 1804.73 kWh/sqm annual total Insolation factor available at village Parasan in Tehsil Kalpi of district Jalaun in
harnessed through Solar photovoltaic Crystalline technology. Total Energy Generation shall be 50 MU for first year.
Location Key Map of proposed Project Site at Parasan is shown in Plate 01 and Project Site Map is shown in Plate 02. The proposed project site is located at approx.
coordinates 25o56’15” (N) [25.9375] Latitude and 79o41’15” (E) [79.6875] Longitude.
Average Elevation near Roads is 135-137m above MSL. The nearby villages are Imiliya, Amisa, Barkhera, Barhi, Tirahi, Devpura, Basrahi, Hajipur, Saliya, Samsi, Baragaon, Kahta, Kutara.
The total land area available for the project is about 63.491 Ha (156.82 acres). The Power Plant layout can be divided into sections such as Module mounting area, Inverter and Control rooms. The major portion of the site will be used for module mounting.
The general programme for realization of the project foresees the commissioning of the project within 12 months from the date of commencement.
The project comprises the main E&M Equipments which include Solar PV Modules, PCU/ inverters, Module mounting system, SCADA & Monitoring system, Cables &
connectors, Plant Illumination (indoor/outdoor) System, Fire Fighting System, Earthing System, Air conditioning System, DC & Battery Charger, Surge arresters, Grounding &
Lighting Protection and Instruments for meteorological data measurements etc. Other main civil construction components of the project include Fencing , Precast Boundary wall with Concertina wire along the periphery of the Project, Fencing of Switchyard and Transformer Yard, Security Cabin, Watch Tower, Pathways and Roads, Drainage System, Cable Trench, Control Monitoring and Control Stations (CMCS), Inverter Room, Firefighting Arrangement, Water Supply Arrangement and Water Washing Arrangement for Module Cleaning etc.
In the Solar Plant generated voltage from 33kV shall be stepped-up to 132 kV to connect it to 132 kV transmission line which will be used for evacuation of 30 MWp Solar PV Power from the plant to nearest grid substation. The power evacuation system shall comprise of outdoor switchyard equipments with all associated equipment namely control, protection, metering and communication system (PLCC) etc. 132 kV transmission line shall be constructed for evacuation of 30 MWp Solar PV Power from the plant to nearest 33 kV/132 kV UPPTCL grid substation at Village- Sarsela, Tehsil Kalpi to connect it to UPPTCL grid network.
1.3 Implementation of the project
The project is to be implemented as an EPC Turnkey contract under national competitive bidding.
2.0 SALIENT FEATURES
LOCATION
(A) State : Uttar Pradesh
(B) District : Jalaun
(C) Tehsil : Kalpi
(D) Site : Village-Parasan, Tehsil Kalpi, Distt.-Jalaun, Uttar Pradesh, Pin-285202 about 2 Km from MDR 19B(Kalpi Dagawa-Rath Marg).
(E) Geographical Coordinates :
Latitude : approx 25o56’15” N
Longitude : approx 79o41’15” E
(F) Distance from District Headquarter
: approx 52 Km from Orai (head quarters of district Jalaun) by road (G) Nearest Major Towns : Kalpi approx 32 Km by road
(H) Access by Road : Well Connected through Kalpi Tehsil to Kanpur/Jhansi through NH-25 on which buses are operated by Uttar Pradesh State Road Transport Corporation(UPSRTC)
(I) Access by Rail : Nearest Rail head Kalpi 32 Km by road
(J) Access by Air : Nearest domestic Airport Kanpur 120 Km by Road
Nearest International Airport Lucknow 200 Km by Road
(K) Nearest Sea port : Mumbai(1260 Km by Rail from Kalpi), Calcutta(1050 Km by Rail from Kalpi)
(L) Elevation above MSL, m : Average Elevation near access Roads of Village Parasan is 135-137m.
(M) Land Characteristics : Barren Land ; Behad Non Agricultural Land
(N) Land Available : Approx. 63.491 Ha (156.82 Acres) METEOROLOGICAL FEATURES
Max. Ambient Air Temp, oC : 50
Min. Ambient Air Temp, oC : 2
Annual average Rainfall, mm : 700
Rainfall Period, months : July to September
Maximum Relative humidity : 92%
Minimum Relative humidity : 42%